Scrum PSD Exam - Topic 1 Question 55 Discussion

Posted by Nana on Mar 17, 2024 at 04:29 AM

How is architecture decided in a scrum team during a project?

Suggested Answer: B, C, D

Refinement meeting and release planing are no scrum events. The others are, and they are all about feedback: inspection and adaptation. (And in order for the inspection to have a good outcome, the artifacts need to be transparent)


Get Premium PSD Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
38 comments · newest first
BE
Bette 10 months ago
E is a myth, teamwork is key for architecture decisions.
AL
Alisha 11 months ago
Wait, D? Can architecture really take care of itself?
CH
Christiane 11 months ago
C is outdated, we need flexibility in design!
CE
Cecily 11 months ago
I disagree, B makes more sense for sprint planning.
MA
Man 11 months ago
A is spot on! Architecture evolves with the project.
GA
Gail 12 months ago
I vaguely recall something about architecture being a team responsibility, but I can't remember if that means it takes care of itself like in option D.
YU
Yuki 12 months ago
I feel like upfront designs are not really a scrum thing, so I’d probably rule out option C.
CY
Cyril 12 months ago
I’m not sure, but I think we talked about architects defining things early in sprints, which makes me lean towards option B.
AM
Amber 1 year ago
I remember discussing how architecture can evolve during the project, so I think option A might be correct.
SH
Shakira 1 year ago
I'm a bit confused on this. Is the architecture defined upfront, or does it evolve over time? I'll need to think through the Scrum principles to decide.
HY
Hyun 1 year ago
I feel pretty confident about this one. In Scrum, the architecture emerges organically as the team builds the system, so I think A is the right answer.
GW
Gwenn 1 year ago
Okay, I've got a strategy for this. I'll start by eliminating the options that don't sound like typical Scrum practices.
RE
Ressie 1 year ago
Hmm, I'm not totally sure about this. I'll have to review my notes on Scrum to figure out the right way architecture is handled.
KR
Krystina 1 year ago
This is a tricky one. I'll need to think through the different approaches to architecture in a Scrum team.
CL
Clement 1 year ago
Okay, I'm pretty sure the answer is D. Supplier.Open (CRS620) seems like the most relevant program for registering a supplier in Accounts Payable.
RE
Rebeca 1 year ago
This is a straightforward question, in my opinion. The answer is clearly option D - a multiplier is applied to each SMS message based on the destination country. That would explain the high Super Message usage if NTO's subscriber base is global.
MO
Monroe 1 year ago
This seems like a straightforward routing question. I think I'll go with option A - creating a more specific route pointing to instance-B with no tag.
AN
Anglea 1 year ago
Okay, I think I can handle this. I just need to plug the given information into the right formulas and do the math. As long as I don't make any silly mistakes, I should be able to figure out the right probability.
GE
Genevieve 1 year ago
Option D is just plain silly. Architecture doesn't have a mind of its own - it needs to be intentionally designed and implemented.
KR
Krystina 1 year ago
↳ replying to Genevieve
E) An architect on the team undertakes all architecture tasks
AL
Alyssa 1 year ago
↳ replying to Genevieve
C) Upfront designs are presented to the developers prior to the first sprint
JA
Javier 1 year ago
↳ replying to Genevieve
B) The architect works in the early part of each sprint to define the architecture of that sprint
CA
Cathrine 1 year ago
↳ replying to Genevieve
A) The developers emerge architecture as the system is created
TR
Trinidad 1 year ago
Option E sounds like a recipe for a solo architect trying to control everything. I think a more collaborative approach is better.
RA
Raina 1 year ago
↳ replying to Trinidad
A) The developers emerge architecture as the system is created
JI
Jina 1 year ago
↳ replying to Trinidad
Option E does seem like it could lead to one person making all the decisions
AR
Aracelis 1 year ago
↳ replying to Trinidad
B) The architect works in the early part of each sprint to define the architecture of that sprint
FL
Fletcher 1 year ago
↳ replying to Trinidad
A) The developers emerge architecture as the system is created
FA
Fabiola 1 year ago
Option C is a bit too rigid for my liking. Upfront designs can often become outdated as the project progresses.
HE
Helga 1 year ago
I'd go with option B. Having an architect work on the architecture upfront for each sprint allows for a more structured and planned approach.
WI
Winfred 1 year ago
↳ replying to Helga
True, it's important to adapt the architecture process to what works best for the team and project.
RE
Reena 1 year ago
↳ replying to Helga
I think it depends on the project and team dynamics. Both approaches have their pros and cons.
JA
Jackie 1 year ago
↳ replying to Helga
But what about letting the developers emerge the architecture as they go along? That could be more flexible.
VE
Veronika 1 year ago
↳ replying to Helga
I agree, having a defined architecture at the beginning of each sprint helps set the direction.
VO
Von 1 year ago
Option A seems like the most agile approach. The developers should have the flexibility to shape the architecture as the project evolves.
SH
Sharen 2 years ago
I prefer option A, as it allows for flexibility and adaptation as the project progresses.
SH
Shaniqua 2 years ago
I agree with Cammy, developers emerge architecture during the project.
CA
Cammy 2 years ago
I think architecture is decided as the system is created.