Halloween Special 2026! Get Up to 25% OFF Practice Questions! Limited Time - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Genesys GE0-807 Exam - Topic 12 Question 29 Discussion

Posted by Jeanice on May 04, 2022 at 07:13 PM

Which header in the INVITE message will SIP Server analyze in order to select the proper geo-location for an inbound call?

Suggested Answer: A

http://docs.genesys.com/Special:Repository/sip81rn.html?id=c4d480e4-94a2-4cf8-ac24-5ccf3ccb7759

Get Premium GE0-807 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
13 comments · newest first
TA
Tasia 12 months ago
"Contact" doesn't play a role in geo-location, right?
FR
Freeman 1 year ago
Surprised it's not "via," I always assumed that was important.
SI
Simona 1 year ago
I thought it might be "To" instead.
DA
Daniel 1 year ago
Totally agree, "From" is the key!
RI
Rima 1 year ago
It's the "From" header that matters for geo-location.
AL
Alecia 1 year ago
I thought "contact" was more about the endpoint rather than geo-location, but I could be mixing it up with another topic.
BR
Brandon 1 year ago
I feel like "via" might be relevant too, but I can't recall how it ties into geo-location specifically.
PH
Phuong 1 year ago
I remember practicing a question similar to this, and I think it was about the "To" header being important for routing.
NI
Nickolas 1 year ago
I think the SIP server looks at the "From" header for geo-location, but I'm not entirely sure.
RY
Ryann 1 year ago
This looks like a classic privilege escalation attack. The hacker is trying to exploit a software flaw to gain admin access and modify the site's configuration.
LA
Lauran 1 year ago
Hmm, I'm a bit unsure about this one. The question is asking how the level of risk should be determined, but the options seem to be talking about different ways of combining factors. I'll need to think this through carefully.
MA
Mari 1 year ago
I vaguely recall a practice question about data security, and option C sounds familiar when we talked about risks with microcomputer-prepared files.
BE
Beata 1 year ago
This seems straightforward enough. I'll recommend updating the production order status when the vendor's work is done, creating an operation to track the vendor's progress, and automatically generating purchase orders for the subcontracted operations. That should cover the key actions.
0/2000 characters

Save Cancel