Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

CIPS L4M2 Exam - Topic 1 Question 32 Discussion

Posted by Herman on Apr 21, 2024 at 09:53 PM

An example of a performance specification is a ...

Suggested Answer: A

Cracks on the jet engine is a closed-end problem. A typical problem solving process has 8 steps:

Step 1: Define the Problem

- What is the problem?

- How did you discover the problem?

- When did the problem start and how long has this problem been going on?

- Is there enough data available to contain the problem and prevent it from getting passed to the next process step? If yes, contain the problem.

Step 2: Clarify the Problem

- What data is available or needed to help clarify, or fully understand the problem?

- Is it a top priority to resolve the problem at this point in time?

- Are additional resources required to clarify the problem? If yes, elevate the problem to your leader to help locate the right resources and form a team.

- Consider a Lean Event (Do-it, Burst, RPI, Project).

- Ensure the problem is contained and does not get passed to the next process step.

Step 3: Define the Goals

- What is your end goal or desired future state?

- What will you accomplish if you fix this problem?

- What is the desired timeline for solving this problem?

Step 4: Identify Root Cause of the Problem

- Identify possible causes of the problem.

- Prioritize possible root causes of the problem.

- What information or data is there to validate the root cause?

Step 5: Develop Action Plan

- Generate a list of actions required to address the root cause and prevent problem from getting to others.

- Assign an owner and timeline to each action.

- Status actions to ensure completion.

Step 6: Execute Action Plan

- Implement action plan to address the root cause.

- Verify actions are completed.

Step 7: Evaluate the Results

- Monitor and Collect Data.

- Did you meet your goals defined in step 3? If not, repeate th 8-Step Process.

- Were there any unforeseen consequences?

- If problem is resolved, remove activities that were added previously to contain the problem.

Step 8: Continuously Improve

- Look for additional opportunities to implement solution.

- Ensure problem will not come back and communicate lessons learned.

- If needed, repeat the 8-Step Problem Solving Process to drive further improvements.

ANA has already known what is going on, the next step they should adopt is collecting more infor-mation on the problem. If the airline is hurry to the solution, it may choose 'Generate options ad-dressing the issue'. The crack on turbine blade can be welded, or the airline replaces a new blade. However, jumping to solution without knowing the root cause does not completely solve the prob-lem. The root cause is unaddressed, then it may occur in the future. Therefore, the airline should still collect information to find the root cause, then remove it.


LO 1, AC 1.1

Get Premium L4M2 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
46 comments · newest first
JE
Jeannetta 11 months ago
Not sure about that, seems off to me.
EI
Eileen 11 months ago
Wait, is a brand name really a performance spec?
AR
Ariel 12 months ago
I thought it could also be a technical drawing?
GE
Geoffrey 12 months ago
Totally agree, outputs are key!
BR
Brice 1 year ago
A performance spec is usually a list of outputs.
AR
Arthur 1 year ago
I feel like inputs and outputs are both important, but I can't recall which one is specifically a performance spec. Is it C or B?
RO
Rolland 1 year ago
I practiced a question like this before, and I think it was about defining what a product needs to achieve. So, B sounds right to me.
SA
Sabrina 1 year ago
I'm not entirely sure, but I remember something about technical drawings being related to specifications. Could it be D?
LI
Lindsey 1 year ago
I think a performance specification is more about what the product should do, so maybe it's B, the list of outputs?
LI
Lindsey 1 year ago
I'm a bit confused on the difference between a performance specification and other types of specifications. I'll have to review my notes before deciding on the answer.
AN
Andrew 1 year ago
I remember learning about performance specifications in class. I believe the correct answer is B - a list of outputs.
PR
Princess 1 year ago
A performance specification is probably more about the technical details and requirements, so I'm guessing the answer is D - a technical drawing.
LE
Lezlie 1 year ago
Hmm, I'm not totally sure about this one. I'll have to think it through carefully before answering.
AD
Adrianna 1 year ago
This one seems pretty straightforward. I think the answer is B - a list of outputs.
BI
Billy 1 year ago
Hmm, I'm a bit unsure about this one. I know cloud services use a lot of different protocols, so it's hard to say which one is the least likely to be supported. I'll have to think this through carefully.
RO
Ronald 1 year ago
Hmm, this looks like a tricky MPLS question. I'll need to carefully analyze the diagram and the answer choices to determine the true statement about Router R1.
TA
Tamar 1 year ago
Okay, let's think this through step-by-step. We have 50 samples with 8 readings each, and we need to find the control limits for a median chart. I remember learning about this in class, so I think I can handle it.
SH
Shonda 1 year ago
Inputs? That's what I do best - taking in information and promptly forgetting it.
SU
Sue 1 year ago
Brand name? That's what I call my personal brand of procrastination.
RO
Rosendo 1 year ago
↳ replying to Sue
D) Technical drawing
FR
Freeman 1 year ago
↳ replying to Sue
C) List of inputs
AZ
Azzie 1 year ago
↳ replying to Sue
B) List of outputs
CL
Clarinda 1 year ago
↳ replying to Sue
A) Brand name
SE
Selma 1 year ago
Technical drawing? I can barely draw a stick figure, let alone a performance spec.
IL
Iluminada 1 year ago
↳ replying to Selma
D) Technical drawing
WI
Wilson 1 year ago
↳ replying to Selma
C) List of inputs
CA
Carylon 1 year ago
↳ replying to Selma
B) List of outputs
HE
Hermila 1 year ago
↳ replying to Selma
A) Brand name
ST
Staci 1 year ago
↳ replying to Selma
Yeah, I prefer working with brand names for specifications.
SO
Son 1 year ago
↳ replying to Selma
D) Technical drawing
TA
Talia 1 year ago
↳ replying to Selma
C) List of inputs
DO
Dorathy 1 year ago
↳ replying to Selma
B) List of outputs
SA
Samuel 1 year ago
↳ replying to Selma
A) Brand name
NA
Nakita 1 year ago
↳ replying to Selma
I know what you mean, technical drawings can be intimidating.
NA
Naomi 1 year ago
↳ replying to Selma
D) Technical drawing
PE
Peggy 1 year ago
↳ replying to Selma
C) List of inputs
CH
Chun 1 year ago
↳ replying to Selma
B) List of outputs
CA
Carline 1 year ago
↳ replying to Selma
A) Brand name
AL
Alaine 2 years ago
A list of outputs? Sounds like my grocery list!
GI
Gilbert 1 year ago
↳ replying to Alaine
D) Technical drawing
AD
Adell 1 year ago
↳ replying to Alaine
C) List of inputs
AN
Anthony 1 year ago
↳ replying to Alaine
B) List of outputs
FR
Franklyn 1 year ago
↳ replying to Alaine
A) Brand name
AL
Alba 2 years ago
Well, a performance specification typically includes a list of desired outputs, so I still think B) is the correct answer.
NA
Nadine 2 years ago
I disagree, I believe it's D) Technical drawing.
AL
Alba 2 years ago
I think the answer is B) List of outputs.
0/2000 characters

Save Cancel