For this question, please refer to the following control chart, which shows the results of the last 23 runs of a process. The process has been in operation for 500 runs, and each run takes 1 day.
This question is driving me bananas! I bet the correct answer is C - normal variation. It's like watching paint dry, but at least it's predictable, right?
Whoa, this is a real head-scratcher! I'm going to have to go with option B - process instability. The control chart looks like a rollercoaster ride, so there's definitely something unstable going on here.
I agree with you, option B - process instability seems to be the best choice. The chart is all over the place, indicating that the process is not stable.
I'm leaning towards option C - normal variation. The chart seems to show random fluctuations within a certain range, which is typical of normal variation in a process.
Hmm, I'm not so sure. The data points seem to be within the control limits, so I think this is just normal variation in the process. Option C seems like the best choice here.
This is definitely a process shift. The data points are clearly outside the control limits, indicating a problem with the process. I'm confident that option A is the correct answer.
Hana
2 months agoJaney
23 days agoMoon
29 days agoSina
1 months agoLauran
1 months agoTiffiny
3 months agoKanisha
1 months agoMyong
1 months agoFrancine
2 months agoMonroe
3 months agoNoe
1 months agoRebeca
1 months agoDavida
2 months agoCarlota
3 months agoIola
2 months agoChristene
3 months agoBrandon
3 months agoDalene
3 months agoDierdre
3 months agoDalene
3 months ago