VMware 5V0-21.21 Exam - Topic 1 Question 94 Discussion

Actual exam question for VMware's 5V0-21.21 exam
Question #: 94
Topic #: 1
[All 5V0-21.21 Questions]

A company hosts a vSAN 7 stretched cluster for all development workloads. The original sizing of a maximum of 250 concurrent workloads in the vSAN cluster is no longer sufficient and needs to increase to at least 500 concurrent workloads within the next six months.

To meet this demand, the original 8-node (4-4-1) cluster has recently been expanded to 16 nodes (8-8-1).

Which three additional steps should the administrator take to support the current growth plans while minimizing the amount of resources required at the witness site? (Choose three.)

Show Suggested Answer Hide Answer
Suggested Answer: A, B, C

https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.vsan-planning.doc/GUID-05C1737A-5FBA-4AEE-BDB8-3BF5DE569E0A.html