During a design workshop, an architect discovers that a customer plans to deploy Arc GIS and AutoCAD applications to a subi of VDI users. The project will scale to 1500 general purpose desktops, 50 AutoCAD users and 25 ArcGIS users. Planned redundancy must allow one host to be removed from any cluster for maintenance while still accomodating all users.
Desktops will be configured for each of the user groups:
* General purpose - 2vCPU, 2GB RAM, 40GB HOD, Windows 7
* AutoCAD - 4vCPU, 16GB RAM, 200GB HOD, Windows 7
* ArcGIS - 4vCPU, 8GB RAM, 500GB HOD, Windows 10
Referring to the exhibit, which two cluster configurations are recomended to support these desktop pools? {Choose two.)
I doubt option B can handle all those users effectively.
RU
Ruthann1 year ago
Wait, why Windows 7 for general purpose? That's outdated!
GA
Garry1 year ago
Not sure about that, C seems more balanced overall.
GI
Gianna1 year ago
I think option A has better redundancy for the ArcGIS users.
TH
Thea1 year ago
Looks like option C is the best fit for the AutoCAD users.
LA
Laquanda1 year ago
I feel like option C could work since it has a good mix of nodes and RAM, but I'm not entirely confident about the GPU profiles.
LA
Larae1 year ago
This question seems similar to one we practiced about VDI setups. I think the clusters need to balance the RAM and GPU requirements for AutoCAD and ArcGIS users.
AN
An1 year ago
I remember we discussed the importance of redundancy in clusters, but I'm not sure which configurations would best support the user groups here.
SE
Sena1 year ago
I think I recall that having separate clusters for different workloads can help with performance, but I can't remember if that's the case here.
JE
Jerry1 year ago
I think I've got a handle on this. Time groups should let me control the time slots the schedule assistant displays, but the key is that it shouldn't impact the actual booking start times. I'll need to double-check that, but I'm feeling pretty confident about this one.
VA
Vallie1 year ago
This seems like a straightforward question about project management plans. I'm pretty confident I can figure this out.
RU
Ruth1 year ago
I think the correct pair is 51% and acquired since that's how control works in most cases, but I could be mixing it up with asset purchases.
Log in to Pass4Success
Sign in:
Report Comment
Is the comment made by USERNAME spam or abusive?
Commenting
In order to participate in the comments you need to be logged-in.
You can sign-up or
login