Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

ScrumStudy SMC Exam - Topic 1 Question 57 Discussion

Posted by Detra on Aug 24, 2022 at 11:05 PM

The Chief Scrum Master is a part of the Scrum Core Team that assembles to retrospect the project and to

identify, document, and internalize the lessons learned. There are various tools to Retrospect Project during

the Retrospect Project Meeting. Which of the following tools can be used in this process?

Suggested Answer: D

Get Premium SMC Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
13 comments · newest first
LA
Layla 11 months ago
I thought Gap analysis was more for planning, not retrospectives.
VE
Veda 11 months ago
Speed Boat is a fun way to visualize team challenges!
MI
Mindy 12 months ago
Wait, can we really use Proof of Concept in a retrospective? Seems odd.
OT
Otis 12 months ago
Totally agree, SWOT analysis can be super helpful too!
GO
Golda 12 months ago
Gap analysis is definitely a solid tool for retrospectives.
EL
Eladia 1 year ago
I practiced a similar question where we had to choose tools for retrospectives, and I think all of these could be useful in some way.
ED
Edmond 1 year ago
Proof of Concept seems more like a testing phase tool, not really for retrospectives, right?
ME
Merissa 1 year ago
I think Gap analysis could be relevant, but I also recall that Speed Boat is a popular tool for retrospectives.
TH
Thad 1 year ago
I remember discussing SWOT analysis in class, but I'm not entirely sure if it's specifically for retrospectives.
MA
Matthew 1 year ago
I'm leaning towards B, 5 active versions, but I'm not 100% certain. I'll make a note to double-check the documentation on flow limits before submitting my answer.
FR
Francine 1 year ago
I'm pretty sure the answer is electronic expansion valve, since that's the more advanced throttling device used in modern air conditioning systems.
SE
Selma 1 year ago
I'm leaning towards the Symmetric binding assertion. That seems like it would be the most flexible option to handle the confidentiality requirement without tying us to a specific encryption type.
LA
Lashon 1 year ago
To finish, we’d need the gross salary figure; without it we can’t compute the exact liability.
0/2000 characters

Save Cancel