SAP Exam C_TS422_2021 Topic 7 Question 41 Discussion

Actual exam question for SAP's C_TS422_2021 exam
Question #: 41
Topic #: 7
[All C_TS422_2021 Questions]

You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

Show Suggested Answer Hide Answer
Suggested Answer: B, C

Contribute your Thoughts:

Lashawn
3 months ago
I wonder if the exam author has a crystal ball to see into the future and know exactly when these operations will be dispatched. Seems like a lot of guesswork to me!
upvoted 0 times
...
Francine
3 months ago
Option C all the way! Move that previously dispatched operation forward like a boss. Who needs to follow the rules when you can just make your own?
upvoted 0 times
Trevor
1 months ago
D) The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
upvoted 0 times
...
Veronika
1 months ago
C) The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
upvoted 0 times
...
Mirta
2 months ago
B) The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
upvoted 0 times
...
Dortha
2 months ago
A) The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
upvoted 0 times
...
...
Jamal
3 months ago
Hmm, this is a tricky one. I'm leaning towards option D, where the new operation is inserted at the desired time and the previously dispatched operation is moved backward. It just seems more straightforward to me.
upvoted 0 times
Desmond
2 months ago
I also believe option A is the right choice. It maintains the order of operations on the work center.
upvoted 0 times
...
Flo
2 months ago
I agree with option A. It makes sense to keep the previously dispatched operation as is.
upvoted 0 times
...
Shelba
2 months ago
I think option A is correct. The new operation is inserted after the previously dispatched operation.
upvoted 0 times
...
...
Cathrine
3 months ago
I'm not sure about this one. Wouldn't it be better to insert the new operation before the previously dispatched one? That way, we don't have to move the existing operation.
upvoted 0 times
Angelyn
2 months ago
I think option B makes more sense. It would be less disruptive to the existing operations.
upvoted 0 times
...
Dante
2 months ago
B) The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
upvoted 0 times
...
Loreta
2 months ago
A) The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
upvoted 0 times
...
...
Merissa
3 months ago
Option C seems like the logical choice here. The new operation should be inserted at the desired time, and the previously dispatched operation should be moved forward to accommodate it.
upvoted 0 times
...
Pearly
4 months ago
But if the new operation is inserted at the desired time, wouldn't the previously dispatched operation need to be moved forward to make space?
upvoted 0 times
...
Heike
4 months ago
I disagree, I believe the answer is A.
upvoted 0 times
...
Pearly
4 months ago
I think the answer is C.
upvoted 0 times
...

Save Cancel