You post a goods receipt for a purchasing document and inspection type 01 is active in the material master. The supplier has not provided the mandatory quality certificate. Which of the following process steps is possible? Note: There are 2 correct answers to this question.
For inspection type 01 (Goods Receipt) with a missing mandatory certificate (set in the quality info record, transaction QI01):
Recording of Inspection Results (B): The inspection lot is created (status CRTD), and you can record results (transaction QE51N) even without the certificate, as this step precedes the usage decision (UD).
Recording of Defects (D): Defects can be recorded (e.g., via QE51N or QF01) during inspection, regardless of certificate status, to document issues found.
Confirmation of Certificate Receipt After Usage Decision (A): Certificate receipt must be confirmed before UD if mandatory (controlled by the 'Certificate Check' setting); this option is not possible post-UD.
Posting of the Usage Decision (C): UD (transaction QA11) is blocked if the certificate is mandatory and missing, as the system sets a status (e.g., CCRQ) until resolved.
Thus, 'Recording of inspection results' and 'Recording of defects' are the correct answers.
Currently there are no comments in this discussion, be the first to comment!