SAP C_TS414_2023 Exam - Topic 1 Question 26 Discussion

Posted by Louisa on Apr 08, 2025 at 07:25 AM

Which dynamic modification levels can be set in the inspection plan? Note: There are 3 correct answers to this question.

Suggested Answer: A, C, D

Dynamic modification levels in SAP QM determine the granularity at which inspection scope changes (e.g., reduced to full inspection) are applied in an inspection plan (transaction QP01):

Characteristic Level (A): Modification can occur at the individual characteristic level within an operation, allowing specific MICs to skip or intensify based on their quality history.

Inspection Lot Level (C): The entire inspection lot can be modified (e.g., skipped), based on the quality level for the material or combination (e.g., material/supplier).

Operation Level (D): Modification can apply to an operation, adjusting all characteristics within it based on performance (e.g., operation-specific skip).

Inspection Type Level (B): Inspection types define the process (e.g., 01 for GR), but dynamic modification is not set at this level; it's tied to plans or lots.

Work Center (E): Work centers are execution locations, not a level for dynamic modification in QM.

Thus, 'Characteristic level,' 'Inspection lot level,' and 'Operation level' are the correct answers.


Get Premium C_TS414_2023 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
37 comments · newest first
IS
Isadora 10 months ago
Wait, are we sure about the inspection type level?
AL
Alana 11 months ago
Operation level? Seems right to me!
FE
Felicidad 11 months ago
I think inspection lot level is also correct.
RE
Rene 11 months ago
Characteristic level is definitely one.
CA
Carey 11 months ago
Work center is not a dynamic modification level, right?
BL
Blondell 12 months ago
I’m uncertain about work center, but I know we discussed inspection type and characteristic levels in detail.
RO
Rose 12 months ago
I feel like operation level could be one of the answers, but I can't recall if inspection lot level was mentioned in our study materials.
HE
Henriette 1 year ago
I remember practicing a question similar to this, and I think the inspection type level might be correct too.
MI
Miesha 1 year ago
I think the characteristic level is definitely one of the options, but I'm not sure about the others.
CH
Chery 1 year ago
This is a good question to test our understanding of inspection plan settings. I'll methodically go through each option to determine the 3 correct answers.
BE
Bettye 1 year ago
I'm not totally confident on this one. I'll make my best guess, but I may need to come back to it if I have time at the end.
SH
Sherita 1 year ago
Okay, I've got this. The 3 correct answers are Characteristic level, Inspection type level, and Inspection lot level.
CA
Casie 1 year ago
I'm a bit unsure about this one. Let me think through the different levels of dynamic modification that could be set in an inspection plan.
DO
Dominque 1 year ago
Hmm, this seems straightforward. I'll carefully read through the options and select the 3 correct answers.
RO
Roosevelt 1 year ago
I'm pretty confident that A, B, and D are the right choices. Although, I have to admit, the work center option did make me chuckle. Gotta keep us on our toes, don't they?
MO
Mozell 1 year ago
↳ replying to Roosevelt
I agree, A, B, and D seem like the most logical choices.
FA
Fannie 1 year ago
↳ replying to Roosevelt
Yeah, work center was unexpected. But I'm sticking with A, B, and D.
RO
Roxane 1 year ago
↳ replying to Roosevelt
I think A, B, and D are correct too. Work center was a curveball.
KI
Kimbery 2 years ago
Haha, I bet the person who wrote this question was just trying to trip us up with that work center option. Nice try, but I'm not falling for it! A, B, and D are the winners here.
VI
Viola 1 year ago
↳ replying to Kimbery
I almost fell for it, but I remembered to focus on the inspection plan.
NO
Noel 1 year ago
↳ replying to Kimbery
Yeah, the work center option was definitely a tricky one.
BE
Bette 1 year ago
↳ replying to Kimbery
I agree, A, B, and D are the correct dynamic modification levels.
BE
Beth 2 years ago
I also think the inspection lot level could be another dynamic modification level that can be set in the inspection plan. It allows for adjustments based on the specific inspection lots being processed.
CH
Cheryll 2 years ago
I agree with Ashton. Those three levels make sense because they are directly related to the specific characteristics, types of inspections, and operations being performed.
GL
Glendora 2 years ago
This question is a piece of cake! Everyone knows the correct answers are A, B, and C. Dynamic modification at the inspection lot level? That's a no-brainer.
NA
Nan 1 year ago
↳ replying to Glendora
C) Inspection lot level
RH
Rhea 1 year ago
↳ replying to Glendora
B) Inspection type level
FA
Fabiola 2 years ago
↳ replying to Glendora
A) Characteristic level
SV
Svetlana 2 years ago
Hmm, I'm not so sure about E. Work center? That doesn't really make sense to me in the context of dynamic modification levels. I'd go with A, B, and C.
JO
Johnna 1 year ago
↳ replying to Svetlana
Yes, those are the correct options for dynamic modification levels in the inspection plan.
CA
Carissa 1 year ago
↳ replying to Svetlana
So, we're all in agreement that it's Characteristic level, Inspection type level, and Inspection lot level.
NO
Noel 1 year ago
↳ replying to Svetlana
I agree, Work center doesn't seem to fit in this context.
GE
German 1 year ago
↳ replying to Svetlana
I think A, B, and C are the correct dynamic modification levels.
AS
Ashton 2 years ago
I think the dynamic modification levels in the inspection plan can be set at the characteristic level, inspection type level, and operation level.
MA
Mariko 2 years ago
I think A, B, and D are the correct answers. The inspection plan can definitely be modified at the characteristic, inspection type, and operation levels.
TY
Ty 1 year ago
↳ replying to Mariko
Yes, those are the correct answers. The inspection plan can be modified at the characteristic, inspection type, and operation levels.
TY
Ty 2 years ago
↳ replying to Mariko
I agree, A, B, and D are the correct options for dynamic modification levels in the inspection plan.