New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

SAP C_TS414_2023 Exam - Topic 1 Question 26 Discussion

Actual exam question for SAP's C_TS414_2023 exam
Question #: 26
Topic #: 1
[All C_TS414_2023 Questions]

Which dynamic modification levels can be set in the inspection plan? Note: There are 3 correct answers to this question.

Show Suggested Answer Hide Answer
Suggested Answer: A, C, D

Dynamic modification levels in SAP QM determine the granularity at which inspection scope changes (e.g., reduced to full inspection) are applied in an inspection plan (transaction QP01):

Characteristic Level (A): Modification can occur at the individual characteristic level within an operation, allowing specific MICs to skip or intensify based on their quality history.

Inspection Lot Level (C): The entire inspection lot can be modified (e.g., skipped), based on the quality level for the material or combination (e.g., material/supplier).

Operation Level (D): Modification can apply to an operation, adjusting all characteristics within it based on performance (e.g., operation-specific skip).

Inspection Type Level (B): Inspection types define the process (e.g., 01 for GR), but dynamic modification is not set at this level; it's tied to plans or lots.

Work Center (E): Work centers are execution locations, not a level for dynamic modification in QM.

Thus, 'Characteristic level,' 'Inspection lot level,' and 'Operation level' are the correct answers.


Contribute your Thoughts:

0/2000 characters
Isadora
2 months ago
Wait, are we sure about the inspection type level?
upvoted 0 times
...
Alana
2 months ago
Operation level? Seems right to me!
upvoted 0 times
...
Felicidad
3 months ago
I think inspection lot level is also correct.
upvoted 0 times
...
Rene
3 months ago
Characteristic level is definitely one.
upvoted 0 times
...
Carey
3 months ago
Work center is not a dynamic modification level, right?
upvoted 0 times
...
Blondell
3 months ago
I’m uncertain about work center, but I know we discussed inspection type and characteristic levels in detail.
upvoted 0 times
...
Rose
3 months ago
I feel like operation level could be one of the answers, but I can't recall if inspection lot level was mentioned in our study materials.
upvoted 0 times
...
Henriette
4 months ago
I remember practicing a question similar to this, and I think the inspection type level might be correct too.
upvoted 0 times
...
Miesha
4 months ago
I think the characteristic level is definitely one of the options, but I'm not sure about the others.
upvoted 0 times
...
Chery
4 months ago
This is a good question to test our understanding of inspection plan settings. I'll methodically go through each option to determine the 3 correct answers.
upvoted 0 times
...
Bettye
4 months ago
I'm not totally confident on this one. I'll make my best guess, but I may need to come back to it if I have time at the end.
upvoted 0 times
...
Sherita
4 months ago
Okay, I've got this. The 3 correct answers are Characteristic level, Inspection type level, and Inspection lot level.
upvoted 0 times
...
Casie
5 months ago
I'm a bit unsure about this one. Let me think through the different levels of dynamic modification that could be set in an inspection plan.
upvoted 0 times
...
Dominque
5 months ago
Hmm, this seems straightforward. I'll carefully read through the options and select the 3 correct answers.
upvoted 0 times
...
Roosevelt
10 months ago
I'm pretty confident that A, B, and D are the right choices. Although, I have to admit, the work center option did make me chuckle. Gotta keep us on our toes, don't they?
upvoted 0 times
Mozell
8 months ago
I agree, A, B, and D seem like the most logical choices.
upvoted 0 times
...
Fannie
8 months ago
Yeah, work center was unexpected. But I'm sticking with A, B, and D.
upvoted 0 times
...
Roxane
9 months ago
I think A, B, and D are correct too. Work center was a curveball.
upvoted 0 times
...
...
Kimbery
10 months ago
Haha, I bet the person who wrote this question was just trying to trip us up with that work center option. Nice try, but I'm not falling for it! A, B, and D are the winners here.
upvoted 0 times
Viola
9 months ago
I almost fell for it, but I remembered to focus on the inspection plan.
upvoted 0 times
...
Noel
9 months ago
Yeah, the work center option was definitely a tricky one.
upvoted 0 times
...
Bette
9 months ago
I agree, A, B, and D are the correct dynamic modification levels.
upvoted 0 times
...
...
Beth
10 months ago
I also think the inspection lot level could be another dynamic modification level that can be set in the inspection plan. It allows for adjustments based on the specific inspection lots being processed.
upvoted 0 times
...
Cheryll
10 months ago
I agree with Ashton. Those three levels make sense because they are directly related to the specific characteristics, types of inspections, and operations being performed.
upvoted 0 times
...
Glendora
10 months ago
This question is a piece of cake! Everyone knows the correct answers are A, B, and C. Dynamic modification at the inspection lot level? That's a no-brainer.
upvoted 0 times
Nan
9 months ago
C) Inspection lot level
upvoted 0 times
...
Rhea
9 months ago
B) Inspection type level
upvoted 0 times
...
Fabiola
10 months ago
A) Characteristic level
upvoted 0 times
...
...
Svetlana
10 months ago
Hmm, I'm not so sure about E. Work center? That doesn't really make sense to me in the context of dynamic modification levels. I'd go with A, B, and C.
upvoted 0 times
Johnna
8 months ago
Yes, those are the correct options for dynamic modification levels in the inspection plan.
upvoted 0 times
...
Carissa
8 months ago
So, we're all in agreement that it's Characteristic level, Inspection type level, and Inspection lot level.
upvoted 0 times
...
Noel
8 months ago
I agree, Work center doesn't seem to fit in this context.
upvoted 0 times
...
German
9 months ago
I think A, B, and C are the correct dynamic modification levels.
upvoted 0 times
...
...
Ashton
10 months ago
I think the dynamic modification levels in the inspection plan can be set at the characteristic level, inspection type level, and operation level.
upvoted 0 times
...
Mariko
10 months ago
I think A, B, and D are the correct answers. The inspection plan can definitely be modified at the characteristic, inspection type, and operation levels.
upvoted 0 times
Ty
9 months ago
Yes, those are the correct answers. The inspection plan can be modified at the characteristic, inspection type, and operation levels.
upvoted 0 times
...
Ty
10 months ago
I agree, A, B, and D are the correct options for dynamic modification levels in the inspection plan.
upvoted 0 times
...
...

Save Cancel