Resources
How are capacity requirements determined?
28 comments · newest first
FL
Fletcher
11 months ago
Yeah, B makes the most sense!
EL
Elbert
11 months ago
Definitely agree with B!
GL
Glen
11 months ago
I think it's B, scheduling is key.
SA
Santos
11 months ago
C is about the control key, right?
IR
Irma
11 months ago
Wait, can capacity really be independent of scheduling?
JU
Junita
12 months ago
I thought capacity requirements were independent of scheduling, but now I'm questioning if that's really the case.
LU
Luke
12 months ago
I feel like the distribution key might play a role in how capacity is calculated, but I need to double-check that.
AH
Ahmed
1 year ago
I remember practicing a question about control keys, but I can't recall if they directly determine capacity requirements.
CA
Casie
1 year ago
I think capacity requirements are linked to scheduling, but I'm not sure if it's specifically the capacity category or something else.
DE
Delmy
1 year ago
This is a good question to test our understanding of capacity planning. I'll methodically go through each option and eliminate the ones that don't seem to fit the description of how capacity requirements are determined.
JA
Jacquline
1 year ago
Wait, I'm confused. I thought capacity planning was more about distribution keys and scheduling, not capacity categories. Let me re-read the question and options carefully before answering.
CO
Corazon
1 year ago
Okay, I've got this. Capacity requirements are determined using scheduling and the capacity category, not independently or based on a control key. I'm confident option B is the correct answer here.
EM
Emogene
1 year ago
Hmm, I'm a bit unsure about this one. I know capacity planning is important, but I'm not totally clear on the specific methods used. I'll have to review my notes and try to reason through the options.
CY
Cyril
1 year ago
This seems like a straightforward question about capacity planning. I'll need to think through the different options and consider how scheduling and capacity categories factor into the determination.
AL
Alison
1 year ago
Haha, using the control key of an activity? That's a good one. I'll go with B though, it makes the most sense.
LA
Laila
1 year ago
User 2: Laila: I'll go with B though, it makes the most sense.
RO
Rose
1 year ago
User 1: Haha, using the control key of an activity?
MI
Micaela
1 year ago
Hmm, I see. Maybe it depends on the specific situation and requirements of the project.
RE
Rene
1 year ago
D seems like the correct answer to me. Capacity requirements are determined using scheduling and distribution key.
MI
Mike
1 year ago
Yes, that's correct. It helps determine the capacity requirements accurately.
JO
Josephine
1 year ago
I think D is the right answer too. Scheduling and distribution key are important.
BI
Billye
1 year ago
I believe it's independent of scheduling and according to the capacity planner group.
JO
Jolanda
1 year ago
I think the answer is B. Capacity requirements are determined using scheduling and the capacity category.
CH
Cheryll
1 year ago
I think D is the correct answer. Using scheduling and distribution key makes sense for determining capacity requirements.
MI
Micheline
1 year ago
I'm not sure, I think it might be C. Using the control key of an activity seems important too.
HA
Hayley
1 year ago
I agree, it makes sense to use scheduling and the capacity category to determine capacity requirements.
FR
Freida
1 year ago
I think the answer is B. Capacity requirements are determined using scheduling and the capacity category.
MI
Micaela
1 year ago
I think capacity requirements are determined using scheduling and the capacity category.