Question #: 36
Topic #: 5
[All C_TS412_2021 Questions]

You are using budgeting and active availability control. How can availability control be activated? Note: There are 2 correct answers to this question

Show Suggested Answer Hide Answer
Suggested Answer: A, D

Availability control is a function that monitors whether the budget for a project is sufficient for planned and actual costs. Availability control can be activated in different ways depending on the settings in the availability control profile and the tolerance limits. Some of these ways are:

Automatic activation with budget assignment: Availability control is activated when you assign budget to a WBS element or a network activity.

Automatic activation with the first actual posting: Availability control is activated when you post the first actual cost to a WBS element or a network activity. Reference: https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/4dd8cb7b1c484b4b93af84d00f60fdb8/79ceb65334


Contribute your Thoughts:

0/2000 characters
Holley
3 months ago
B is definitely a valid option!
upvoted 0 times
...
Reiko
3 months ago
Wait, can you really activate it just with budget assignment? Sounds too easy.
upvoted 0 times
...
Barrett
3 months ago
Totally agree with A, it makes sense!
upvoted 0 times
...
Gerri
4 months ago
I thought D was right too, but I guess not.
upvoted 0 times
...
Raelene
4 months ago
A and C are the correct answers!
upvoted 0 times
...
Christene
4 months ago
I definitely remember that assignment to an investment program was discussed, so that might be one of the correct answers too.
upvoted 0 times
...
Beckie
4 months ago
I’m a bit confused; I thought automatic activation with the first actual posting was a possibility, but I can't recall if it was specifically mentioned in our study materials.
upvoted 0 times
...
Elenora
4 months ago
I remember practicing a question similar to this, and I feel like background activation could be a correct option.
upvoted 0 times
...
Lynsey
5 months ago
I think automatic activation with budget assignment might be one of the answers, but I'm not completely sure about the second one.
upvoted 0 times
...
Ryan
5 months ago
Automatic activation based on budget assignment or investment program assignment - got it. I feel pretty confident about those being the right answers here. The other choices just don't seem to fit the context of the question.
upvoted 0 times
...
Candida
5 months ago
Hmm, this one has me a bit stumped. I'm not totally sure about the difference between the activation methods. I'll need to review my notes on availability control to make sure I understand the nuances.
upvoted 0 times
...
Tasia
5 months ago
I think the key here is to focus on the two correct answers. Automatic activation with budget assignment and automatic activation with assignment to an investment program seem like the most likely options.
upvoted 0 times
...
Colby
5 months ago
Okay, I've got this. Automatic activation with budget assignment and automatic activation with assignment to an investment program are the two correct answers. The other options don't seem to match the question prompt as closely.
upvoted 0 times
...
Laurel
5 months ago
Ah, I've dealt with this kind of issue before. The key is to flush the cache directly through the Workspace ONE UEM console. That will force the updated configuration to be reflected immediately, without having to mess with the Memcached service itself.
upvoted 0 times
...
Micah
5 months ago
I'm a bit confused by the wording of the question. I'll need to read it over a few times.
upvoted 0 times
...
Lettie
1 year ago
I think it's D, automatic activation with the first actual posting. That makes more sense to me.
upvoted 0 times
...
Eva
1 year ago
I'm not sure about those options. I think availability control can be activated in the background with CJBV.
upvoted 0 times
...
Malissa
1 year ago
I believe it can also be activated automatically with assignment to an investment program.
upvoted 0 times
...
Alyce
2 years ago
I think availability control can be activated automatically with budget assignment.
upvoted 0 times
...
Jules
2 years ago
Hmm, I think C is the way to go. That background activation sounds like the perfect solution to me. What do you guys think?
upvoted 0 times
...
Lazaro
2 years ago
Whoa, this one's tricky! I'm guessing it's either A or B, but I can't decide which one's the better answer. Gotta love these budget control questions, right?
upvoted 0 times
Peggie
1 year ago
Let's go with both A and B, just to be safe.
upvoted 0 times
...
Von
1 year ago
I agree, but B) Automatic activation with assignment to an investment program could also be correct.
upvoted 0 times
...
Denny
1 year ago
I think it's A) Automatic activation with budget assignment.