For a 10-day project, activity B ' s duration is three days, and activity C's duration is two days What is the duration of activity A if activities B and C are performed in parallel?
For a 10-day project, activity B ' s duration is three days, and activity C's duration is two days What is the duration of activity A if activities B and C are performed in parallel?
I think I've got it! Since B and C are done in parallel, the total duration of the project is the maximum of their durations, which is 3 days for B. So the duration of A must be 3 days as well. I'll go with A) 3 days.
Hmm, this is tricky. I'm not sure if the parallel nature of B and C affects the duration of A or not. I'll have to think about this a bit more before answering.
Okay, let me think this through. The project is 10 days total, and activities B and C are done in parallel, so the duration of A must be the longest of the three, which is 3 days for activity B. I'll go with A) 3 days.
I'm a bit confused. If activities B and C are performed in parallel, shouldn't the duration of activity A be the maximum of the two, which is 3 days? I'm not sure about this one.
Hmm, this seems straightforward. I think I'll go with B) 5 days since the project is 10 days and the other two activities take 3 and 2 days respectively.
Viola
2 months agoEura
2 months agoMaybelle
2 months agoTimothy
2 months agoCatalina
2 months agoCecil
2 months agoRosendo
3 months agoBeckie
3 months agoCheryl
3 months agoLeila
4 months agoOliva
4 months agoLashonda
4 months agoKandis
4 months agoDiane
4 months agoNettie
4 months agoFrank
5 months agoSueann
5 months agoBritt
5 months agoNobuko
5 months agoKenneth
5 months agoBrice
5 months agoBette
6 months agoLajuana
6 months agoKaycee
6 months agoKaycee
6 months agoRanee
7 months agoZachary
25 days agoMargot
1 month agoCorinne
1 month agoNieves
1 month agoBlair
6 months ago