For a 10-day project, activity B ' s duration is three days, and activity C's duration is two days What is the duration of activity A if activities B and C are performed in parallel?

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

0/2000 characters
Cheryl
15 hours ago
Wait, is this a trick question? I'm so confused, but I'll go with B) 5 days. Sounds like the most reasonable answer.
upvoted 0 times
...
Leila
6 days ago
Haha, this question is a real brain-teaser. I'm going to go with C) 7 days, just to be on the safe side.
upvoted 0 times
...
Oliva
11 days ago
A) 3 days. The question is a trick! Since B and C are done in parallel, the duration of A must be the longest of the three, which is 3 days.
upvoted 0 times
...
Lashonda
16 days ago
D) 10 days. If the project duration is 10 days and the other two activities are done in parallel, then activity A must take the full 10 days.
upvoted 0 times
...
Kandis
21 days ago
C) 7 days. The question states that activities B and C are performed in parallel, so the duration of A must be the remaining time.
upvoted 0 times
...
Diane
26 days ago
B) 5 days. Seems logical since the project duration is 10 days and the other two activities take 5 days in total.
upvoted 0 times
...
Nettie
1 month ago
I’m leaning towards 7 days for A because it seems like it needs to account for both B and C somehow, but I’m not entirely confident.
upvoted 0 times
...
Frank
1 month ago
I practiced a similar question where parallel tasks didn't add up directly. I feel like A could be 5 days, but I could be wrong.
upvoted 0 times
...
Sueann
1 month ago
I remember something about adding durations when activities are in series, but since B and C are parallel, I’m not sure how that affects A.
upvoted 0 times
...
Britt
2 months ago
I think if B and C are done in parallel, A's duration might depend on the longest one, which is B at 3 days?
upvoted 0 times
...
Nobuko
2 months ago
I think I've got it! Since B and C are done in parallel, the total duration of the project is the maximum of their durations, which is 3 days for B. So the duration of A must be 3 days as well. I'll go with A) 3 days.
upvoted 0 times
...
Kenneth
2 months ago
Hmm, this is tricky. I'm not sure if the parallel nature of B and C affects the duration of A or not. I'll have to think about this a bit more before answering.
upvoted 0 times
...
Brice
2 months ago
Activity B takes 3 days, C takes 2 days.
upvoted 0 times
...
Bette
2 months ago
Okay, let me think this through. The project is 10 days total, and activities B and C are done in parallel, so the duration of A must be the longest of the three, which is 3 days for activity B. I'll go with A) 3 days.
upvoted 0 times
...
Lajuana
2 months ago
I think it's 3 days.
upvoted 0 times
...
Kaycee
3 months ago
Wait, is it really just 3 days? That seems too short!
upvoted 0 times
...
Kaycee
3 months ago
I'm a bit confused. If activities B and C are performed in parallel, shouldn't the duration of activity A be the maximum of the two, which is 3 days? I'm not sure about this one.
upvoted 0 times
...
Ranee
3 months ago
Hmm, this seems straightforward. I think I'll go with B) 5 days since the project is 10 days and the other two activities take 3 and 2 days respectively.
upvoted 0 times
Blair
3 months ago
Why do you think that? B and C are happening at the same time.
upvoted 0 times
...
...