Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Nokia 4A0-220 Exam - Topic 1 Question 3 Discussion

Posted by Julianna on Sep 29, 2026 at 05:07 AM

How are L0 and L1 resources coordinated in case of a failure in an MRN?

Suggested Answer: A

Coordination of L0 and L1 resources in case of a failure in an MRN is achieved by setting the color constraints. Color constraints are used to specify which wavelengths or timeslots can be used by a given LSP request. By setting the color constraints, the NFM-T can ensure that the L0 and L1 resources are compatible and consistent across the network. For example, if an L0 LSP request requires a specific wavelength, the NFM-T can set the color constraint to match that wavelength and assign it to the L0 LSP. Similarly, if an L1 LSP request requires a specific timeslot, the NFM-T can set the color constraint to match that timeslot and assign it to the L1 LSP. This way, the coordination of L0 and L1 resources is achieved by ensuring that the same color is used by both layers.Reference:Nokia GMPLS-controlled Optical Networks Course | Nokia,3. GMPLS - Nokia


Get Premium 4A0-220 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
9 comments · newest first
JE
Jeannine 4 days ago
Definitely A), color constraints are key in coordination.
EM
Emmett 10 days ago
Wait, WSR parameter? I didn’t know that was a thing!
SH
Sheron 15 days ago
C) is interesting, but not sure it’s the main method.
MA
Martina 20 days ago
I think B) is more accurate, though.
DA
Darrin 25 days ago
A) seems like the right answer!
DI
Dino 1 month ago
I vaguely recall that the WSR parameter might be involved in coordination, but I can't remember the specifics. It feels like it could be a trick option.
LO
Loreta 1 month ago
I’m a bit confused about the segregation of color and colorless LSPs. Was that really a method for coordination, or was it more about organization?
BE
Bernardine 1 month ago
This question seems familiar; I feel like we discussed how Setup Priorities could play a role in resource coordination during our last practice session.
EL
Elina 2 months ago
I think I remember something about color constraints being important for coordination, but I'm not entirely sure if that's the right answer here.
0/2000 characters

Save Cancel