Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

NetApp NS0-593 Exam - Topic 9 Question 11 Discussion

A customer with an FC MetroCluster configuration that is running NetApp ONTAP 9.8 software experienced a site outage and wants to know why the MetroClusler configuration did not switch over to the other site.What are two reasons for this problem? (Choose two.)
A) There was a failed PSU in the switchover site. and C) The site had unmirrored aggregates.
B) The ISLs were down between the sites.
D) An ISL link was not operating at 16Gbps.

NetApp NS0-593 Exam - Topic 9 Question 11 Discussion

Actual exam question for NetApp's NS0-593 exam
Question #: 11
Topic #: 9
[All NS0-593 Questions]

A customer with an FC MetroCluster configuration that is running NetApp ONTAP 9.8 software experienced a site outage and wants to know why the MetroClusler configuration did not switch over to the other site.

What are two reasons for this problem? (Choose two.)

Show Suggested Answer Hide Answer
Suggested Answer: A, C

Contribute your Thoughts:

0/2000 characters
Jillian
10 months ago
Not sure about that, but I thought ISLs always had redundancy.
upvoted 0 times
...
Goldie
10 months ago
A failed PSU could definitely be a problem too.
upvoted 0 times
...
Gayla
10 months ago
Wait, unmirrored aggregates? That sounds risky!
upvoted 0 times
...
Julianna
10 months ago
Totally agree, that would cause a failover issue.
upvoted 0 times
...
Bulah
10 months ago
The ISLs were down between the sites.
upvoted 0 times
...
Becky
11 months ago
I’m a bit confused about the ISL link speed. Does it really need to be at 16Gbps for the switchover to work? I feel like that could be a factor too.
upvoted 0 times
...
Rosendo
11 months ago
I practiced a question similar to this, and I think a failed PSU could impact the switchover site. It might be one of the reasons.
upvoted 0 times
...
Margarett
11 months ago
I’m not entirely sure, but I think unmirrored aggregates could also be a reason. It seems like that would cause issues during a failover.
upvoted 0 times
...
Theola
11 months ago
I remember something about ISLs being crucial for MetroCluster failover. If they were down, that could definitely prevent a switchover.
upvoted 0 times
...
Salina
11 months ago
Okay, let's see. Billable item type, business partner, and billing process - those seem like the most likely options.
upvoted 0 times
...
Dahlia
11 months ago
Okay, let's see. The "NotNow" event log message suggests the device is not ready to install the app right now. Could be a compatibility issue or network connectivity problem.
upvoted 0 times
...
Latia
11 months ago
I'm a bit unsure, but "isolated" sounds convincing too. Didn't we cover something similar in the review session?
upvoted 0 times
...

Save Cancel