NCARB Project-Management Exam - Topic 5 Question 17 Discussion

The owner and architect sign a Basic Services Agreement for the design of a museum.Based on AIA Document B101-2017, Owner and Architect Agreement, which line items should be excluded from the architect's cost estimate? Check the two that apply.
C) Landscape plants and E) Furniture, furnishings, and equipment design
A) Doors and windows
B) Roofing material
D) HVAC equipment
F) Plumbing fixtures

NCARB Project-Management Exam - Topic 5 Question 17 Discussion

Actual exam question for NCARB's Project-Management exam
Question #: 17
Topic #: 5
[All Project-Management Questions]

The owner and architect sign a Basic Services Agreement for the design of a museum.

Based on AIA Document B101-2017, Owner and Architect Agreement, which line items should be excluded from the architect's cost estimate? Check the two that apply.

Show Suggested Answer Hide Answer
Suggested Answer: C, E

Per AIA B101-2017 6.1, the 'Cost of the Work' includes items designed or specified by the architect in the construction contract. FF&E and owner-provided landscape features (like plants, art, and loose furniture) are typically excluded, as these may be contracted separately by the owner or coordinated outside basic architectural services.


AIA B101-2017 6.1--6.3

NCARB ARE 5.0 Handbook -- PjM & PPD: Project Cost Estimating

AHPP, Chapter 11: Cost Estimating Procedures

Contribute your Thoughts:

0/2000 characters
I practiced a similar question, and I think plumbing fixtures should be included, but I'm uncertain about the landscape plants.
upvoted 0 times
...
Helene
5 days ago
If I recall correctly, roofing materials are usually included, so maybe we should look at HVAC equipment and furnishings as exclusions.
upvoted 0 times
...
Abel
10 days ago
I'm not entirely sure, but I remember something about not including landscaping in the cost estimate.
upvoted 0 times
...
Lizbeth
15 days ago
I think we might need to exclude items that aren't part of the basic services, like furniture and equipment design.
upvoted 0 times
...