NCARB Project-Management Exam - Topic 5 Question 17 Discussion

Posted by Chau on Jul 01, 2026 at 12:32 AM

The owner and architect sign a Basic Services Agreement for the design of a museum.

Based on AIA Document B101-2017, Owner and Architect Agreement, which line items should be excluded from the architect's cost estimate? Check the two that apply.

Suggested Answer: C, E

Per AIA B101-2017 6.1, the 'Cost of the Work' includes items designed or specified by the architect in the construction contract. FF&E and owner-provided landscape features (like plants, art, and loose furniture) are typically excluded, as these may be contracted separately by the owner or coordinated outside basic architectural services.


AIA B101-2017 6.1--6.3

NCARB ARE 5.0 Handbook -- PjM & PPD: Project Cost Estimating

AHPP, Chapter 11: Cost Estimating Procedures

Get Premium Project-Management Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
21 comments · newest first
DE
Desmond 2 days ago
Just remember, it's about the main construction costs.
EM
Emiko 7 days ago
Makes sense. I just want to be sure I get it right.
GI
Giovanna 12 days ago
Right! The estimate focuses on core structural elements.
DE
Desmond 17 days ago
Not really. They fall under different categories.
EM
Emiko 22 days ago
But what about A and D? Aren't they essential?
GI
Giovanna 28 days ago
Agreed! Landscape plants and furniture aren't part of the basic services.
DE
Desmond 1 month ago
I think C and E should be excluded.
CL
Clay 1 month ago
C and E are the right choices, but I’m surprised it’s so clear-cut!
MA
Margart 1 month ago
I thought all building components should be in the estimate.
SO
Soledad 2 months ago
Wait, why wouldn't roofing materials be included? Seems odd.
HA
Hana 2 months ago
I agree, C and E make sense.
JO
Josphine 2 months ago
Definitely C and E! Those shouldn't be in the estimate.
HO
Hoa 2 months ago
A and B are definitely part of the estimate, right?
SH
Sherrell 2 months ago
I think D should be included, not excluded.
TA
Tamra 2 months ago
Wait, why would you exclude furniture design? Seems important!
LI
Lindsey 3 months ago
I agree, C and E make sense.
MA
Maurine 3 months ago
Definitely C and E! Those should be excluded.
CE
Celestina 3 months ago
I practiced a similar question, and I think plumbing fixtures should be included, but I'm uncertain about the landscape plants.
HE
Helene 3 months ago
If I recall correctly, roofing materials are usually included, so maybe we should look at HVAC equipment and furnishings as exclusions.
AB
Abel 3 months ago
I'm not entirely sure, but I remember something about not including landscaping in the cost estimate.
LI
Lizbeth 4 months ago
I think we might need to exclude items that aren't part of the basic services, like furniture and equipment design.