NCARB PDD Exam - Topic 1 Question 19 Discussion

Posted by Myra on Aug 18, 2026 at 02:44 PM

The architect has completed 60% of the construction documents. The owner wants to establish the guaranteed maximum price (GMP) at this point before 100% of the construction documents are complete. Several flooring finish items are still undetermined.

What should be included in the project manual to make sure the contractor has a cost to cover all finishes?

Suggested Answer: C

When a GMP (Guaranteed Maximum Price) is established before the design is 100% complete and specific materials are not yet chosen, the correct approach is to specify allowances in the project manual.

An allowance is a fixed monetary amount for a specific scope item (e.g., flooring finishes) that allows the contractor to carry a cost in the bid/GMP until the actual product is selected. This ensures the GMP covers the item without delaying pricing.

A . Contingency --- Is for unforeseen conditions, not specific unselected finishes.

B . Schedule of unit prices --- Typically used for variable-quantity work, not for unknown product selection.

D . Alternate --- Provides an option for substitution, but does not guarantee a base cost in the GMP.

PDD Reference: ARE 5.0 PDD ''Project Manual and Specifications---Allowances, Alternates, and Unit Prices,'' AIA A201 3.8, CSI Division 01---General Requirements.


Get Premium PDD Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
12 comments · newest first
KR
Kristofer 3 days ago
Surprised they want a GMP with 60% docs done. Seems risky!
DE
Denae 8 days ago
Totally agree, it gives clarity on costs!
LU
Lura 13 days ago
I think a schedule of flooring unit prices is essential.
LA
Lavonda 18 days ago
Wait, why are we deciding on finishes so early?
CR
Cristy 23 days ago
A contingency might be safer, but still risky.
LA
Lawrence 29 days ago
Not sure about that, what if the prices change later?
EL
Elenore 1 month ago
Definitely agree, unit prices help a lot!
RO
Rosio 1 month ago
I think option B is the best choice.
FL
Flo 1 month ago
I think option D could be useful if the owner wants flexibility in flooring choices, but I'm not sure if it directly addresses the cost coverage for all finishes.
AR
Armando 2 months ago
I practiced a similar question where we had to consider contingencies. Option A seems like it could provide a safety net, but I'm not convinced it's the best answer here.
MY
Myra 2 months ago
I'm not entirely sure, but I feel like including a schedule of unit prices could help clarify costs for the contractor. That sounds like option B.
PH
Phillip 2 months ago
I remember discussing how allowances can help cover unknowns in finishes, so I think option C might be a good choice.