NAHQ CPHQ Exam - Topic 5 Question 95 Discussion

Posted by Rosenda on May 26, 2026 at 02:07 PM

The chart above is used by a team to document process improvement results following an intervention that was implemented during the 20th week. Based on this chart, the team can conclude:

Suggested Answer: B

Understanding the Control Chart ComponentsThis control chart shows the median delay over time (by week), with control limits (UCL - Upper Control Limit, LCL - Lower Control Limit) and a center line (CL) indicating the process average before the intervention. Control charts like this one are used to determine whether an intervention has led to a significant change in process performance.

Analyzing the Data Before and After the Intervention

From weeks 1 to 19, before theintervention, the process appears to fluctuate around the control limits, with several points near the upper control limit, indicating higher variation and a generally stable process around a higher median delay.

After week 20, following the intervention, the data points show a clear shift downward, consistently staying below the previous control line (CL). The process median delay has notably reduced, and all data points fall within a new, lower range.

Conclusion Based on the Control Chart

The consistent reduction in median delay and the clustering of data points below the previous center line indicate a shift in performance rather than mere random variation. This type of change, sustained over multiple weeks, strongly suggests that the intervention had a substantial impact on reducing the delay.

While there may also be a decrease in variation, the primary visible effect is a shift in performance toward lower median delay values.

Rationale for Selecting Answer BThe correct answer is B. The intervention resulted in a shift in performance, as the chart shows a distinct change in the process level post-intervention, indicating an improvement.


NAHQ 'Quality Improvement in Healthcare: Statistical Process Control'

'Interpreting Control Charts forProcess Improvement' (NAHQ, 2020)

Get Premium CPHQ Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
19 comments · newest first
AM
Ammie 12 days ago
D is definitely not right, we saw improvements.
DA
Dahlia 17 days ago
I’m leaning towards C, but need more evidence.
IL
Ilda 23 days ago
A could be true, but B is more direct.
LI
Lizbeth 28 days ago
I feel confident about B, it aligns with our data.
FR
France 1 month ago
B shows clear results, that's what we need.
BR
Bronwyn 1 month ago
D doesn't fit, performance improved overall.
BR
Brandon 1 month ago
C is misleading, we can't say it's in control yet.
FR
Francoise 2 months ago
A seems valid too, but not as strong.
ST
Stefania 2 months ago
I agree, the intervention clearly shifted performance.
MA
Magnolia 2 months ago
I think B is the best choice.
DE
Deonna 2 months ago
Wait, are we sure about that performance shift?
SC
Scot 2 months ago
I think we can say the process is in control now.
LO
Loreta 2 months ago
Surprised to see such a downward trend!
BE
Berry 3 months ago
I disagree, the performance shift isn't clear.
LA
Lashunda 3 months ago
Looks like variation has definitely decreased!
GI
Giuseppe 3 months ago
I vaguely recall that if variation decreases, it might suggest the process is more stable, which could support A. But I’m not confident about that.
EL
Ellsworth 3 months ago
I feel like we had a practice question that mentioned trends, and it was about identifying if performance was improving or declining. Could D be a possibility?
ER
Erick 3 months ago
I'm not entirely sure, but I remember something about control charts. If the process is in control, wouldn't that mean A could also be true?
DO
Dominga 4 months ago
I think we discussed how a shift in performance usually indicates a successful intervention, so maybe B is the right choice?