SIMULATIONTask 2You plan to promote a domain controller named DC3 in a site in Seattle.You need to ensure that DC3 only replicates with DC1 and DC2 between 8 pm and 6 AM.
A) See the solution of this Task below

Microsoft AZ-800 Exam - Topic 2 Question 86 Discussion

Actual exam question for Microsoft's AZ-800 exam
Question #: 86
Topic #: 2
[All AZ-800 Questions]

SIMULATION

Task 2

You plan to promote a domain controller named DC3 in a site in Seattle.

You need to ensure that DC3 only replicates with DC1 and DC2 between 8 pm and 6 AM.

Show Suggested Answer Hide Answer
Suggested Answer: A

TASK 2

Objective: Configure DC3 to replicate with DC1 and DC2 only between 8:00 PM and 6:00 AM.

Step-by-Step Guide: Replication Scheduling for DC3

Step 1: Promote DC3 to a Domain Controller (if not already done)

Use Server Manager or PowerShell to install the Active Directory Domain Services role and promote the server as a domain controller.

Example PowerShell command to install the AD DS role:

powershell

Copy

Install-WindowsFeature AD-Domain-Services

To promote:

powershell

Copy

Install-ADDSDomainController -DomainName 'contoso.com'

Step 2: Open Active Directory Sites and Services

Log in to DC3 or another DC with administrative tools.

Open Active Directory Sites and Services (dssite.msc).

Step 3: Locate the Site

In the left pane, expand the Sites container and find the site that contains DC3.

Expand the site to find Servers.

Under Servers, select DC3.

Step 4: Configure Replication Connection Objects

Expand DC3 and click on NTDS Settings.

In the right pane, you'll see connection objects to other domain controllers (these represent replication partners).

Step 5: Adjust the Replication Schedule for Each Connection

For each connection object to DC1 and DC2:

Right-click the connection object and select Properties.

Click the Change Schedule button.

Step 6: Set the Replication Schedule

In the schedule window, you'll see a grid of hours.

Clear all hours except the time window of 8 PM to 6 AM (in 1-hour blocks).

Select 8 PM to 6 AM (10 hours total) for all days.

Click OK to save.

Step 7: Verify and Document

Ensure that both connection objects (to DC1 and DC2) have the updated schedule.

Document your configuration as part of your environment's change control.