You have an Azure subscription. The subscription contains virtual machines that run either Windows Server or Linux.
You plan to use Prometheus to monitor performance metrics.
You need to integrate Prometheus and Azure Monitor.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Suggested Answer: A, B
Get Premium AZ-400 Questions
as Interactive Web-Based Practice Test or PDF
Real Exam Format
Detailed Explanations
Instant Access
Get Your Practice Test
12 comments · newest first
SE
Selene
12 months ago
Wait, do we really need a virtual network service endpoint for this?
TW
Twila
1 year ago
Linux VM is the way to go for Prometheus, right?
CA
Carli
1 year ago
Not sure about installing Prometheus on a Windows VM though.
LO
Long
1 year ago
Definitely agree with that!
HU
Hubert
1 year ago
You need to expose the metrics endpoint for Prometheus.
KR
Kristofer
1 year ago
I recall that installing a Prometheus server on a Linux VM was mentioned in our study materials, so option F could be correct as well.
JU
Julio
1 year ago
I'm not entirely sure, but I feel like enabling the Azure Diagnostics extension might be relevant. It seems like it could help with monitoring, but I need to double-check.
JA
Jacki
1 year ago
I remember that we discussed the importance of exposing metrics endpoints for Prometheus to scrape data, so I think option B could be one of the answers.
LU
Luis
1 year ago
I practiced a similar question where we had to integrate different monitoring tools with Azure. I think option D about the containerized agent might be a good choice too.
CA
Caprice
1 year ago
Hmm, I'm a bit unsure about this one. I need to make sure I understand the structure of an LDAP directory and what the base DN represents.
CO
Corrina
1 year ago
Hmm, I'm not too sure about this one. I know we use odpscmd to connect to MaxCompute, but I'm not familiar with the specific commands to view table size. I'll have to think this through carefully.
LU
Luann
1 year ago
Okay, I've got this. The flow chart is a visual representation of the auditor's understanding of the entity's information system, so the correct answer is B.