Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Juniper JN0-460 Exam - Topic 5 Question 9 Discussion

Actual exam question for Juniper's JN0-460 exam
Question #: 9
Topic #: 5
[All JN0-460 Questions]

You are asked to deploy a 5-stage IP Clos campus fabric using claim codes for all of the switches.

Which two statements are correct about this process? (Choose two.)

Show Suggested Answer Hide Answer
Suggested Answer: B, D

During campus fabric deployment in Mist AI, switches are onboarded using claim codes and must be assigned to the correct site and online so that Mist can push configurations and validate connectivity.

''All switches to be included in a campus fabric must be claimed, online, and assigned to the target site before launching the Campus Fabric wizard. Mist Cloud automatically discovers their roles and builds the topology.''

Option A: Incorrect --- switches must be site-assigned before fabric creation.

Option B: Correct --- switches must be online to receive configurations from Mist.

Option C: Incorrect --- offline devices cannot be configured or validated in the fabric wizard.

Option D: Correct --- switches must be assigned to the correct site for topology creation.


Juniper Mist AI for Wired -- Campus Fabric IP Clos Deployment Guide

Juniper Mist AI for Wired -- Campus Fabric Onboarding Requirements

Juniper Validated Design -- Campus Fabric Claiming and Site Assignment

===========

Contribute your Thoughts:

0/2000 characters
I think B is correct. The switches need to be online for the wizard.
upvoted 0 times
...
Sylvia
5 days ago
Wait, can you really deploy without them being online? Sounds odd!
upvoted 0 times
...
Annett
10 days ago
D makes sense, can't deploy without site assignment.
upvoted 0 times
...
Fredric
15 days ago
I thought C was true, but I guess not!
upvoted 0 times
...
Carolann
20 days ago
A is misleading, they should be assigned to the site.
upvoted 0 times
...
Trina
26 days ago
B is definitely correct, they need to be online.
upvoted 0 times
...
Karina
1 month ago
Wait, we need to use claim codes for the switches? I thought those were just for buying new cars!
upvoted 0 times
...
Jovita
1 month ago
Hmm, this question is a real head-scratcher. I hope the exam doesn't have too many of these tricky ones!
upvoted 0 times
...
Sylvia
2 months ago
Option C is just plain wrong. The switches definitely need to be online for this process.
upvoted 0 times
...
Anjelica
2 months ago
Option D is also correct. The switches must be assigned to the site where you plan to deploy the campus fabric.
upvoted 0 times
...
Yoko
2 months ago
Option B is correct. The switches must be online when you begin the Campus Fabric wizard.
upvoted 0 times
...
Zachary
2 months ago
From what I recall, the Campus Fabric wizard requires the switches to be online, but I can't remember if site assignment is mandatory or not.
upvoted 0 times
...
Lezlie
3 months ago
I’m a bit confused about whether the switches need to be online. I feel like I read something that said they could be offline, but that doesn't seem right.
upvoted 0 times
...
Bettina
3 months ago
I remember practicing a similar question, and I think the switches definitely need to be assigned to the site before deployment.
upvoted 0 times
...
Serita
3 months ago
I think the switches need to be online for the Campus Fabric wizard, but I'm not entirely sure if they have to be assigned to a specific site.
upvoted 0 times
...
Micheal
3 months ago
Alright, I've got this. The switches don't need to be online when you start the wizard, but they do need to be assigned to the site. The claim codes are probably just for identifying the switches. I'm feeling confident about this one.
upvoted 0 times
...
Dorinda
3 months ago
I'm a bit confused by this question. Do the switches need to be online or not? And what's the deal with the claim codes? I'll have to review my notes on campus fabric deployment.
upvoted 0 times
...
Vallie
3 months ago
I've done something similar before, so I think I've got a good handle on this. The switches definitely need to be assigned to the site, but I'm not sure about the online requirement.
upvoted 0 times
...
Luis
4 months ago
Okay, let's see. I think the key is understanding whether the switches need to be online or assigned to the site before starting the Campus Fabric wizard. I'll have to read the options closely.
upvoted 0 times
...
Estrella
4 months ago
Hmm, this seems like a tricky one. I'll need to think carefully about the requirements for deploying a 5-stage IP Clos campus fabric.
upvoted 0 times
...

Save Cancel