New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

ISTQB-CTFL Exam - Topic 2 Question 17 Discussion

Actual exam question for ISTQB's ISTQB-CTFL exam
Question #: 17
Topic #: 2
[All ISTQB-CTFL Questions]

When should component integration tests be carried out?

Show Suggested Answer Hide Answer
Suggested Answer: D

Component integration tests are designed to verify the interactions and interfaces between integrated components. These tests should be carried out after component testing (where individual components are tested in isolation) but before system testing (where the entire system is tested as a whole). This ensures that any issues arising from the integration of components are identified and resolved early in the testing process, making option D the correct answer.


Contribute your Thoughts:

0/2000 characters
Francis
3 months ago
I've seen it done both ways, but I prefer before system tests.
upvoted 0 times
...
Cassandra
3 months ago
Definitely not after acceptance tests, that's too late!
upvoted 0 times
...
Gayla
3 months ago
Wait, are we sure they should always be before system tests?
upvoted 0 times
...
Dorinda
4 months ago
I totally agree, timing can vary based on the project.
upvoted 0 times
...
Daniel
4 months ago
Integration tests can be done before or after system tests.
upvoted 0 times
...
Celeste
4 months ago
I thought integration tests were supposed to happen after system tests, but that seems counterintuitive now that I think about it.
upvoted 0 times
...
Felton
4 months ago
I feel like integration tests are flexible and can happen both before and after system tests, but I can't recall the exact reasoning.
upvoted 0 times
...
Hoa
4 months ago
I remember a practice question that said integration tests are usually done before system tests, but I’m not completely confident about that.
upvoted 0 times
...
Carmen
5 months ago
I think integration tests can be done at different stages, but I’m not sure if they should always be before system tests.
upvoted 0 times
...
Cristal
5 months ago
Okay, I've got a strategy for this. Integration tests are about checking how different components work together, so it makes sense to do them before system tests, which are testing the whole system. I'm going with option D.
upvoted 0 times
...
Janey
5 months ago
Hmm, I'm a bit confused about this. I thought integration tests were supposed to come after system tests, but option C says we can do them before or after. I'll have to think this through more carefully.
upvoted 0 times
...
Christene
5 months ago
This is a tricky one. I'm not entirely sure when the best time to do integration tests is, but I think option C sounds right - we can do them before or after system tests.
upvoted 0 times
...
Albina
5 months ago
Easy peasy! Integration tests should always be done before system tests, to catch any issues with how the components interact early on. Option D is the way to go.
upvoted 0 times
...
Sanjuana
5 months ago
I think the key here is to set up an approval process based on the Expense amount. Option C looks like the way to go.
upvoted 0 times
...
Hershel
5 months ago
Hmm, there are a lot of specific requirements here. I'll need to carefully read through each one and make sure I address them all.
upvoted 0 times
...
Albina
5 months ago
I'm pretty sure Azure Databricks and Azure HDInsight are the two services that can be used to provision Spark clusters. I've worked with both of them before, so I feel confident about this.
upvoted 0 times
...
Shawn
5 months ago
Wait, I'm a little confused. I thought digital signatures were used to create certificate requests, not to sign them. Maybe I'm misremembering the details. I'll have to think about this one a bit more.
upvoted 0 times
...
Ashlyn
2 years ago
I believe integration tests should be done before system tests to catch any issues early on.
upvoted 0 times
...
Brandon
2 years ago
I disagree. Integration tests can be done before or after system tests, depending on the project requirements.
upvoted 0 times
...
Alline
2 years ago
I agree with Desirae. It makes sense to ensure individual components work before integrating them.
upvoted 0 times
...
Desirae
2 years ago
I think integration tests should always be done after system tests.
upvoted 0 times
...
Veta
2 years ago
I always do integration tests after system tests, to make sure everything is working together properly.
upvoted 0 times
...
Latosha
2 years ago
I think it depends on the project, but generally I agree with
upvoted 0 times
...
Harley
2 years ago
I disagree, I believe integration tests can be done before or after system tests.
upvoted 0 times
...
Mozell
2 years ago
I think integration tests should be done before system tests.
upvoted 0 times
...
Ashleigh
2 years ago
Haha, I think the exam designers are trying to trick us with these options. They're all technically correct in some scenarios, but we need to choose the best one.
upvoted 0 times
...
Rosendo
2 years ago
I'm with Vonda on this one. Option C seems the most flexible and practical approach. Integration tests can happen at different stages, as long as they're thorough.
upvoted 0 times
Della
2 years ago
I agree, integration tests can be done before or after system tests.
upvoted 0 times
...
Annmarie
2 years ago
I think Option C is the most flexible approach.
upvoted 0 times
...
...
Gretchen
2 years ago
Option D seems a bit too absolute, don't you think? I'm not sure integration tests should 'always' be done before system tests. It depends on the project, really.
upvoted 0 times
...
Vonda
2 years ago
Hmm, I'm leaning towards option C. It makes sense that integration tests can be done before or after system tests, depending on the project's needs and the development lifecycle.
upvoted 0 times
...
Carri
2 years ago
Yes, I agree. Integration tests focus on how different components of the system work together, while system tests look at the overall functionality of the complete system.
upvoted 0 times
...
Jamal
2 years ago
I think this question is a tricky one. We need to really understand the difference between integration tests and system tests to answer it correctly.
upvoted 0 times
...

Save Cancel