Question #: 19
Topic #: 4
[All TMMi-P_Syll2.1 Questions]

Which of the following statements is TRUE?

Show Suggested Answer Hide Answer
Suggested Answer: D

Formal assessments, in contrast to informal ones, are conducted with more rigor, and the results can lead to an official certification of maturity level. A formal assessment report includes a validated maturity level rating, making it distinct from informal assessments, which are used only for indicative purposes and do not result in an official rating. Thus, only formal assessments provide an assessment report with a valid maturity level rating.


Contribute your Thoughts:

0/500 words
Asha
3 days ago
I'm leaning towards D because I recall that only formal assessments give a valid maturity level rating, but I could be mixing it up.
upvoted 0 times
...
Portia
9 days ago
I feel like we practiced a question similar to this, and I think B was mentioned as a requirement for formal assessments.
upvoted 0 times
...
Gearldine
14 days ago
I think I remember that informal assessments don't need a lead assessor, so maybe C is true? But I'm not completely sure.
upvoted 0 times
...
Huey
20 days ago
Whoa, this is a tricky one. I'm not totally confident in my knowledge of TMMi assessment requirements. I'll have to make an educated guess and hope for the best.
upvoted 0 times
...
Royal
25 days ago
Okay, I've got this. The key is to focus on the specific details provided in each option. I think I know which one is the true statement, but I'll double-check my reasoning before selecting the answer.
upvoted 0 times
...
Shelba
1 month ago
Hmm, I'm a bit unsure about the differences between informal and formal assessments. I'll need to think this through step-by-step to make sure I understand the correct answer.
upvoted 0 times
...
Estrella
1 month ago
This looks like a straightforward question about the requirements for TMMi assessments. I'll read through the options carefully and try to identify the true statement.
upvoted 0 times
...
Eleni
2 months ago
I remember studying this, and I think the correct answer is B.
upvoted 0 times
...
Emilio
2 months ago
I'm not sure, but I think it might be A.
upvoted 0 times
...
Mollie
2 months ago
I disagree, I believe the answer is D.
upvoted 0 times
...
Mendy
3 months ago
B can't be true, that would be way too rigid. Each process area should have its own set of generic practices.
upvoted 0 times
...
Oretha
3 months ago
Hmm, D sounds about right to me. The sub-practices and typical work products go hand-in-hand in the TMMi model.
upvoted 0 times
Xuan
2 months ago
A) The maturity levels of TMMi describe detailed sub-practices for each specific goal.
upvoted 0 times
...
...
Vernice
3 months ago
I think C is the correct answer. Specific goals can have different specific practices at different maturity levels, allowing for flexibility and customization.
upvoted 0 times
Shonda
2 months ago
That's true, it allows organizations to tailor their processes based on their specific needs and level of maturity.
upvoted 0 times
...
Quentin
3 months ago
I agree, specific goals can indeed have different specific practices at different maturity levels.
upvoted 0 times
...
Dalene
3 months ago
I think C is the correct answer. Specific goals can have different specific practices at different maturity levels, allowing for flexibility and customization.
upvoted 0 times
...
...
Jackie
3 months ago
I think the answer is C.
upvoted 0 times
...