Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

iSQI CTAL-TAE Exam - Topic 5 Question 29 Discussion

A SUT has an existing automated test suite.Which of the following statements relating to the introduction of new features in the SUT is TRUE?
A) Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort
B) The introduction of a new feature could require updates or additions to the testware components
C) The test automation engineer should work with the business analysts to ensure the new feature is testable
D) It is generally more difficult to automate test cases for a new feature as the development has not yet started

iSQI CTAL-TAE Exam - Topic 5 Question 29 Discussion

Actual exam question for iSQI's CTAL-TAE exam
Question #: 29
Topic #: 5
[All CTAL-TAE Questions]

A SUT has an existing automated test suite.

Which of the following statements relating to the introduction of new features in the SUT is TRUE?

Show Suggested Answer Hide Answer
Suggested Answer: A

Contribute your Thoughts:

0/2000 characters
Mila
10 months ago
I think B and C are both true, but not sure about D.
upvoted 0 times
...
Sanjuana
10 months ago
Wait, D makes it sound like we can't automate until dev starts? Really?
upvoted 0 times
...
Dierdre
10 months ago
A is totally wrong, tests are always impacted by changes.
upvoted 0 times
...
Audra
10 months ago
I agree with C, collaboration is key for testability!
upvoted 0 times
...
Garry
10 months ago
Definitely B, new features usually need test updates.
upvoted 0 times
...
Raina
11 months ago
I recall a practice question about the challenges of automating tests for features still in development, so option D seems plausible too.
upvoted 0 times
...
Alease
11 months ago
I think I read somewhere that collaborating with business analysts is crucial for ensuring new features are testable, which makes option C sound right.
upvoted 0 times
...
Isreal
11 months ago
I remember discussing how new features often require updates to existing tests, so I think option B might be correct.
upvoted 0 times
...
Agustin
11 months ago
I'm not entirely sure, but I feel like automated tests can still run even if a new feature is added. Maybe option A is misleading?
upvoted 0 times
...
Darnell
11 months ago
Okay, the key here is that the BA is reviewing the risks associated with a proposed solution. That sounds like they're doing a risk analysis to me, but I'm not 100% confident. I'll make a guess and move on.
upvoted 0 times
...
Christiane
11 months ago
Withhold sounds right, but I always get nervous about these terminology questions. Gotta read carefully.
upvoted 0 times
...
Myong
11 months ago
I'm a little confused by the different protocol abbreviations. I'll need to make sure I understand what each one means and how they relate to the problem before selecting an answer.
upvoted 0 times
...
Donte
11 months ago
I'm a bit confused on this question. I know Transportation Demand Management includes things like carpooling and bike racks, but I'm not sure which of these options doesn't fit. I'll have to review my notes to be sure.
upvoted 0 times
...

Save Cancel