MultipleChoice
By default workflows always have a run status of succeeded. Identify the methods to change the run status of the workflow. For the puposes of this question, assume there are no worklets in the workflow.
OptionsMultipleChoice
Two pipelines (A & B) are entering a Joiner transformation with each having a record size of 100 bytes. Pipeline A has a total of 1000 records and Pipeline B has a total of 1,000,000 records. Which pipeline should be designated the master pipeline?
OptionsMultipleChoice
Of the statements below, which best describes the underlying process taken when a user connects to a PowerCenter Repository Service for the first time? For the puposes of this question, the PowerCenter Developer is the only PowerCenter client application running, there are 2 nodes in the domain, node 1 is a gateway node and node 2 is a worker node. The PowerCenter Repository Service is running on the worker node.
Options