Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Free Huawei H35-561 Exam Dumps

Here you can find all the free questions related with Huawei HCIP LTE RNP&RNO V1.0 (H35-561) exam. You can also find on this page links to recently updated premium files with which you can practice for actual Huawei HCIP LTE RNP&RNO V1.0 Exam. These premium versions are provided as H35-561 exam practice tests, both as desktop software and browser based application, you can use whatever suits your style. Feel free to try the HCIP LTE RNP&RNO V1.0 Exam premium files for free, Good luck with your Huawei HCIP LTE RNP&RNO V1.0 Exam.
Question No: 1

MultipleChoice

Which of the following reasons will cause radio frequency unit accept channel RTWP/RSSI too low alarm? (Multiple choice)

Options
Question No: 2

MultipleChoice

Which of the following is a UPEUc output power and 2 piece of UPEU output power in current mode?

Options
Question No: 3

MultipleChoice

In SAE, which of the following entity use to deal with the control plane of S1 interface?

Options
Question No: 4

MultipleChoice

In LTE, the uplink pilot signal includes DMRS and Sounding RS.

Options
Question No: 5

MultipleChoice

D, F, E spectrum corresponding frequency band are respectively 38,39, 40; the corresponding frequency range respectively is 2570-2620,1880-1920,2300-2400.

Options
Question No: 6

MultipleChoice

Assuming other conditions are unchanged, if the power parameter PB is changed from 0 to 1, then which of the following statements is ?

Options
Question No: 7

MultipleChoice

Which of the following information can be observed directly through the Probe drive test tool? (Multiple choice)

Options
Question No: 8

MultipleChoice

For the following LTE neighborhood planning, which description is ? (Multiple choice)

Options
Question No: 9

MultipleChoice

If the cell radius is 90 kilometers, which of the following should be used for the PRACH preamble format?

Options
Question No: 10

MultipleChoice

Under the same coverage requirements, for the comparison between the adoption of f-band network and the adoption of d-band network, the number of stations required is;

Options

Save Cancel