The proposal consists of.
- 3 HPE Synergy 12000 frames
- 6 HPE Composer 2 modules
- 2 HPE Virtual Connect SE 100 GO F32 Module
- 4 HPE Synergy 50 GO interconnect Link Module
Which statements about this proposed design are true? (Select two.)
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)
As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2
Why would you recommend this change?
Which compute node parameters are captured within server hardware type?
Your customer has the following HPE Synergy setup:
- 15 HPE Synergy 12000 frames with 50Gb connectivity to each server port
- 2 HPE Composer 2 modules
- 15 HPE D3940 Storage Modules, one per frame
- 2 HPE 12Gb SAS switches per frame
Which statement about this setup is true?
Currently there are no comments in this discussion, be the first to comment!