Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

HPE0-S59 Exam - Topic 4 Question 75 Discussion

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.What must be done to enable dedicated FC connectivity for this HPE Synergy frame?
A) A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.
B) For Brocade switches, a logical interconnect group must be created in HPE OneView.
C) For VC-FC modules, all of server facing ports must be property licensed.
D) SAS switches must be moved to second fabric and FC modules Installed in the first one.

HPE0-S59 Exam - Topic 4 Question 75 Discussion

Actual exam question for HP's HPE0-S59 exam
Question #: 75
Topic #: 4
[All HPE0-S59 Questions]

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

Show Suggested Answer Hide Answer
Suggested Answer: A

To enable dedicated Fibre Channel (FC) connectivity in an HPE Synergy frame, if using Brocade switches, it is necessary to create a logical interconnect group in HPE OneView. This group defines the configuration and management of FC connectivity for the compute modules. Properly configuring and managing this logical interconnect group ensures that the compute modules can establish dedicated FC connections.


Contribute your Thoughts:

0/2000 characters
Lenita
4 days ago
I feel like option C is important too. Licensing is key for the FC modules.
upvoted 0 times
...
Dwight
10 days ago
I think option B is crucial. We need that logical interconnect group.
upvoted 0 times
...
Darci
15 days ago
Moving SAS switches to the second fabric seems unnecessary to me.
upvoted 0 times
...
Josefa
20 days ago
All server facing ports must be licensed for VC-FC modules, no doubt!
upvoted 0 times
...
Esteban
25 days ago
Wait, do you really need a second CPU for the Gen10 nodes? Sounds off.
upvoted 0 times
...
Reita
1 month ago
Definitely agree with that, it's essential for FC connectivity.
upvoted 0 times
...
Earleen
1 month ago
You need to create a logical interconnect group for Brocade switches.
upvoted 0 times
...
Joanna
1 month ago
I’m not sure about that second CPU requirement, seems unnecessary.
upvoted 0 times
...
Launa
2 months ago
Moving SAS switches to the second fabric sounds right to me.
upvoted 0 times
...
Lanie
2 months ago
Wait, do you really need a second CPU for the compute nodes?
upvoted 0 times
...
Wava
2 months ago
I think all server-facing ports need proper licensing for VC-FC modules.
upvoted 0 times
...
Emmett
2 months ago
You definitely need to create a logical interconnect group in OneView.
upvoted 0 times
...
Cherelle
2 months ago
I vaguely remember that installing a second CPU in the compute nodes might be necessary, but that seems a bit excessive for just adding FC connectivity.
upvoted 0 times
...
Tish
2 months ago
I feel like moving the SAS switches to the second fabric makes sense, but I’m not confident if that’s the right approach for enabling FC connectivity.
upvoted 0 times
...
Viola
3 months ago
I think we discussed that all server-facing ports for the VC-FC modules need to be licensed properly, but I can't recall the exact licensing requirements.
upvoted 0 times
...
Ling
4 months ago
I remember something about needing to create a logical interconnect group for the Brocade switches, but I'm not entirely sure if that's the only step needed.
upvoted 0 times
...

Save Cancel