A typical data center load would consist of _____ (Choose 3)

Show Suggested Answer Hide Answer
Suggested Answer: C

A voltage regulator controls the voltage produced at the output of the alternator. It's a device that maintains the output voltage of an alternating current (AC) power source within a safe range. The voltage regulator compares the actual output voltage to the desired voltage level and adjusts the voltage accordingly.

Voltage Meter, Voltage Stabilizer, and Voltage Backup Device are not devices that control the voltage produced at the output of the alternator. They are different types of equipment and have different functions.

A voltage meter is a device used to measure the voltage in an electrical circuit. A voltage stabilizer is an electronic device that maintains a constant voltage level. A voltage backup device is a device that provides temporary backup power in case of an electrical outage.


Contribute your Thoughts:

Ruth
1 months ago
Alright, let's do this! Cooling, networking, and computers - the holy trinity of data center components. Time to ace this exam!
upvoted 0 times
Long
8 days ago
Software is important too, it helps manage and optimize the data center operations.
upvoted 0 times
...
Queenie
9 days ago
Don't forget about the power generator, it's also an essential part of a data center.
upvoted 0 times
...
Nidia
17 days ago
Cooling equipment, networking equipment, and computers are the key components of a data center load.
upvoted 0 times
...
...
Jolanda
2 months ago
I believe power generator should also be included in the typical data center load. It's important for backup power in case of outages.
upvoted 0 times
...
Colene
2 months ago
Hold up, who needs a power generator when you can just plug the whole data center into a giant hamster wheel? That's the real efficient solution, trust me.
upvoted 0 times
Willard
22 days ago
B: Power generator, Software, Computers
upvoted 0 times
...
Arletta
28 days ago
A: Cooling equipment, Networking equipment, Computers
upvoted 0 times
...
...
Carli
2 months ago
Ah, I see what they're getting at. Gotta include the power generator to keep everything running, and don't forget the software that makes it all work. This is a tricky one!
upvoted 0 times
...
Celestine
2 months ago
I agree with Fletcher. Cooling equipment is necessary to maintain the temperature, networking equipment for communication, and computers for processing data.
upvoted 0 times
...
Glynda
2 months ago
Hmm, I'm pretty sure cooling equipment, networking equipment, and computers are the key components of a data center load. Seems straightforward!
upvoted 0 times
Johnna
10 days ago
Yes, all these components work together to ensure the data center runs smoothly and efficiently.
upvoted 0 times
...
Janae
13 days ago
Software is also important for managing and optimizing the data center operations.
upvoted 0 times
...
Elfrieda
14 days ago
Don't forget about power generators, they are crucial for backup power in case of outages.
upvoted 0 times
...
Buck
17 days ago
Cooling equipment, networking equipment, and computers are definitely essential for a data center load.
upvoted 0 times
...
...
Fletcher
2 months ago
I think a typical data center load would consist of cooling equipment, networking equipment, and computers.