Which statement is true about the synchronization process, as performed by the Configuration Utility or by typing b config sync all?
C) The two /config/bigip.conf configuration files are synchronized (made identical) each time the process is run.
A) The process should always be run from the standby system.
B) The process should always be run from the system with the latest configuration.
D) Multiple files, including /config/bigip.conf and /config/bigip_base.conf, are synchronized (made identical) each time the process is run.