Dell DCPPE-200 Exam Questions

Status: RETIRED
Exam Name: PowerEdge Professional
Exam Code: DCPPE-200
Related Certification(s): Dell Certified Professional Certification
Certification Provider: Dell
Actual Exam Duration: 90 Minutes
Number of DCPPE-200 practice questions in our database: 92 (updated: 03-10-2019)
Expected DCPPE-200 Exam Topics, as suggested by Dell :
  • Topic 1: Install and troubleshoot hardware components in new and existing environments
  • Topic 2: Configure
  • Topic 3: manage and Troubleshoot shared controller and chassis based storage
  • Topic 4: Configure Host Networking
  • Topic 5: IOAs
  • Topic 6: IOM Switches
Disscuss Dell DCPPE-200 Topics, Questions or Ask Anything Related

Currently there are no comments in this discussion, be the first to comment!

Free Dell DCPPE-200 Exam Actual Questions

Note: Premium Questions for DCPPE-200 were last updated On 03-10-2019 (see below)

Question #1

An engineer needs to assign two PCIe NICs and a GPU to a server node in a VRTX chassis.

Which two steps are required to complete this task?

Reveal Solution Hide Solution
Correct Answer: B

Question #2

An engineer needs to configure a single network port on a 10 GbE NIC for four virtual network interfaces. What steps should the engineer perform to complete this task?

Reveal Solution Hide Solution
Correct Answer: B

Question #3

An engineer is redeploying a blade chassis, and is logged into the CMC web interface. The engineer has configured the iDRACs for the blade servers.

When the engineer tries to log into one of the iDRACs, the connection fails. The engineer can ping the CMC from the engineer's workstation but can NOT ping the iDRACs. The engineer tries to ping the iDRAC IP from the CMC itself using the diagnostic tool, but that also fails.

Which two tasks should the engineer perform?

Reveal Solution Hide Solution
Correct Answer: A

Question #4

An engineer is inventorying a newly arrived M1000e shipment that will be used for a virtual environment. The inventory includes the following:

Blade Server Enclosure, M1000E, PowerEdge -- qty 1

Power Supplies 2700W High Efficiency -- qty 3

Redundant Chassis Management Controller- qty 1

Power Cords, QTY3, 8FT, C19/C20 for M1000E Server Blade Chassis -- qty 2

Cat5e Patch Cable 1000Mb -- qty 2

Dell Force10 MXL 10/40 GbE DCB Blade Switch -- qty 2

QSFP+ 40GbE Module, 2 port, Hot Swap -- qty2

SFP+ 10GbE Module, 4 port, Hot Swap -- qty 2

SFP+ to SFP+, 10GbE, Copper Twinax Direct Attach cable, 3 Meters -- qty 8

The chassis power will be set for grid redundancy. The top of rack switches are 10Gb and the management switch is 1000 Base-T. What is missing from this inventory that is needed to accomplish this task?

Reveal Solution Hide Solution
Correct Answer: A

Question #5

Exhibit

Refer to the exhibit.

An engineer has installed a PCle NIC into an FX2 chassis. When the engineer powers up the blade, the NIC is not seen. Without physically moving the PCle NIC or server, how should the engineer make sure that the NIC maps to the server?

Reveal Solution Hide Solution
Correct Answer: C


Unlock Premium DCPPE-200 Exam Questions with Advanced Practice Test Features:
  • Select Question Types you want
  • Set your Desired Pass Percentage
  • Allocate Time (Hours : Minutes)
  • Create Multiple Practice tests with Limited Questions
  • Customer Support
Get Full Access Now

Save Cancel