Refer to the exhibit.
A cable with the following label was connected to the wrong equipment type:
* M91A-01:01 U61A-01:09
Based on the exhibit, what is the target equipment type?
The label on the cable indicates two parts: ''M91A-01:01'' and ''U61A-01:09''. The first part of the label ''M91A'' refers to a specific type of equipment as per the exhibit. According to the exhibit, ''M9'' corresponds to ''MDS 9xxx'', which is a Cisco Multilayer Director Switch. The second part of the label, ''U61A'', does not directly match any category in the provided list; however, it seems to be an internal reference that could be related to user-specific configurations or locations.
Since we are looking for the target equipment type and not where it was mistakenly connected, we focus on the first part of the cable label. The numbers following ''M91A'' indicate slot and port information. Therefore, based on this labeling system and referring to the exhibit provided, which lists various EMC and Cisco equipment types along with their corresponding codes (like AP for APIC Appliance or CN for Cust. Network), we can deduce that ''M91A'' stands for ''MDS 9xxx''. The subsequent numbers ''-01:01'' suggest Slot 1, Port 1.
A customer is using Cisco UCS 6332-16UP 40-Port Fl. They have 16 ports dedicated for FC traffic. The customer needs to increase the number of FC ports.
What is a consideration?
In the Cisco UCS 6332-16UP 40-Port Fabric Interconnect, unused server ports can be converted to FC (Fibre Channel) ports. This flexibility allows customers to reconfigure ports based on their specific needs, increasing the number of available FC ports when additional FC connectivity is required.
Cisco UCS Fabric Interconnect configuration guides.
Cisco UCS 6300 Series Fabric Interconnect data sheets and documentation.
Based on the RCM Upgrade Process RACI, who is responsible and accountable for the pre-upgrade questionnaire used during the Initiation Phase?
In the RCM (Release Certification Matrix) Upgrade Process RACI (Responsible, Accountable, Consulted, Informed) matrix, the pre-upgrade questionnaire used during the Initiation Phase is typically the responsibility and accountability of the Project Manager and the Customer. The Project Manager ensures the completion of the questionnaire to gather necessary information for planning the upgrade, while the Customer provides the required data.
Dell EMC RCM documentation.
Standard RACI matrix practices in project management.
Where is customer feedback captured during the Lessons Learned phase of the project closure?
A VxBlock 1000 system engineer is powering on Advanced Management Pod components. If AMP-VX is used, what is the first component to be powered on?
In a VxBlock 1000 system using AMP-VX, the first component to be powered on is the AMP physical server. This server hosts the management and orchestration tools required to manage the VxBlock system. Ensuring that the AMP physical server is powered on first provides the necessary foundation for other components and services to be initialized and managed properly.
Dell EMC VxBlock System installation and power-on procedures.
AMP-VX deployment and configuration guides.
=========================
Leah
1 months agoArthur
1 months agoNathalie
2 months agoLeonard
2 months agoAmmie
2 months agoLorrine
3 months agoBernardine
4 months agoOdette
4 months agoJesusa
5 months agoGlory
5 months agoCarisa
5 months agoNan
6 months agoBethanie
6 months agoCyril
6 months agoKristeen
7 months agoAnika
7 months agoGeorgene
7 months agoStefanie
7 months agoAretha
8 months agoNydia
8 months agoOmega
8 months agoAlesia
8 months agoViola
8 months agoChantell
8 months agoPeter
9 months agoHildred
9 months agoTorie
9 months agoJina
9 months agoAmmie
10 months agoEdwin
10 months agoCarole
10 months agoMelissa
10 months agoLauryn
10 months agoMarleen
11 months agoReena
11 months agoEthan
11 months agoRebbecca
11 months agoShad
11 months agoAlba
12 months ago