Dell EMC Dell PowerEdge XE9680 and XE8640 Install Exam Questions

Exam Name: Dell PowerEdge XE9680 and XE8640 Install
Exam Code: D-PEXE-IN-A-00
Related Certification(s): Dell EMC PowerEdge Certification
Certification Provider: Dell EMC
Number of Dell PowerEdge XE9680 and XE8640 Install practice questions in our database: 14 (updated: Oct. 19, 2024)
Expected Dell PowerEdge XE9680 and XE8640 Install Exam Topics, as suggested by Dell EMC :
  • Topic 1: Pre-installation tasks: This section involves preparing the environment and server for installation, including reviewing documentation, gathering tools, and verifying the proper workspace.
  • Topic 2: Unpacking the server: This section of the exam covers safely removing the server from its packaging, inspecting for damage, and identifying all included components.
  • Topic 3: Putting the server into the rack: This section of the exam includes securely mounting the server in a compatible rack, ensuring proper airflow and cable management.
  • Topic 4: Connecting power and network cables: This domain covers connecting the server to a power source with the appropriate cable and voltage, and connecting it to the network using compatible cables.
Disscuss Dell EMC Dell PowerEdge XE9680 and XE8640 Install Topics, Questions or Ask Anything Related

Laura

9 days ago
Thanks to Pass4Success for their exam prep materials! They really helped with questions on network daughter card options and configurations.
upvoted 0 times
...

Paris

10 days ago
Excited to share that I passed the Dell PowerEdge XE9680 and XE8640 Install exam! The Pass4Success practice questions were a lifesaver. One question that had me second-guessing was about putting the server into the rack. It asked, 'Which rack unit should the server be placed in for optimal airflow?' I wasn't confident in my answer, but I passed nonetheless.
upvoted 0 times
...

Matthew

19 days ago
Whew, that exam was tough! Grateful for Pass4Success helping me prep in such a short time.
upvoted 0 times
...

Adelina

24 days ago
Memory configuration was a key topic. Expect questions on DIMM population rules and maximum supported capacities for different server models.
upvoted 0 times
...

Rene

25 days ago
Just passed the Dell PowerEdge XE9680 and XE8640 Install exam! Thanks to Pass4Success practice questions, I was well-prepared. There was a tricky question about unpacking the server, specifically asking, 'What is the recommended tool for removing the server from its packaging?' I wasn't completely sure, but I still made it through.
upvoted 0 times
...

Lucina

1 months ago
Just passed the Dell EMC PowerEdge XE9680 and XE8640 Install exam! Pay attention to GPU configuration questions. Understanding NVIDIA A100 and H100 GPU options is crucial.
upvoted 0 times
...

Lennie

1 months ago
I recently passed the Dell EMC Dell PowerEdge XE9680 and XE8640 Install exam, and I couldn't have done it without the Pass4Success practice questions. One question that stumped me was about the correct sequence for connecting power and network cables. It asked, 'What is the first step in connecting the power cables to the server?' I was unsure but managed to pass the exam.
upvoted 0 times
...

Dorthy

2 months ago
Just passed the Dell PowerEdge XE9680 and XE8640 Install exam! Thanks Pass4Success for the spot-on practice questions.
upvoted 0 times
...

Free Dell EMC Dell PowerEdge XE9680 and XE8640 Install Exam Actual Questions

Note: Premium Questions for Dell PowerEdge XE9680 and XE8640 Install were last updated On Oct. 19, 2024 (see below)

Question #1

A deployment engineer goes on-site to install a mix of XE systems in a customer testing and development data center. The customer engineering group is stress testing the PowerEdge XE servers to

determine the best XE server for their software applications. As one of the first steps, they must ensure the correct server rails are on-site.

Which three options are a correct matching of rail type with server type?

Reveal Solution Hide Solution
Correct Answer: B, C, E

To ensure the correct server rails are on-site for the installation of PowerEdge XE servers, it's essential to match the server model with the appropriate rail type. Based on the Dell Enterprise Systems Rail Sizing and Rack Compatibility Matrix, the following matches are correct:

XE9680 and B25: The XE9680 server is compatible with the B25 rail type, which is designed to support the size and weight of this particular server model1.

XE9640 and B25: Similarly, the XE9640 server can also utilize the B25 rail type for secure mounting in a rack1.

XE9680 and B28: Additionally, the XE9680 server is compatible with the B28 rail type, providing an alternative mounting solution1.

It's important to note that the rail types are specific to the server models and are designed to ensure a secure and stable installation in the customer's rack. The Dell Rail Sizing and Rack Compatibility Matrix provides detailed information on the compatibility of different server models with their respective rail types. This document should be consulted to verify the correct rail type for each server model before proceeding with the installation1.


Question #2

What must be considered regarding stab-in rails with installing a PowerEdge XE server?

Reveal Solution Hide Solution
Correct Answer: C

Understanding Stab-in Rails:

Stab-in rails are designed to simplify the server installation process. These rails enable a quick and straightforward installation of the server into the rack.

Compatibility and Usage:

Stab-in rails are specifically designed for use in 4-post racks with square holes. This compatibility ensures stability and proper fitting within the rack structure.

Installation Process:

Before initiating the installation, verify that the rack is a 4-post, square hole type.

Position the stab-in rails to align with the square holes on the rack. Typically, stab-in rails have tabs that fit precisely into these square holes.

Mounting the Server:

Once the rails are securely attached to the rack, the server can be mounted. The design of the stab-in rails facilitates a smooth insertion of the server, ensuring it is securely held in place.

Ensuring Proper Fit:

After the server is mounted, check to ensure that it is level and securely attached. This step is crucial to prevent any movement or displacement that could occur due to vibrations or physical disturbances.


Dell EMC PowerEdge XE9680 and XE8640 Installation and Service Manual: This manual provides detailed instructions on the use and installation of stab-in rails, including compatibility with specific rack types.

Dell EMC Technical Specifications Guide: Offers comprehensive specifications and compatibility information for different mounting and installation hardware used with Dell PowerEdge servers.

Question #3

A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cable management arm (CMA).

What are two items to consider when installing a CMA?

Reveal Solution Hide Solution
Correct Answer: A, B

When installing a Cable Management Arm (CMA) on the Dell PowerEdge XE9680 server, there are specific considerations to ensure proper installation and operation:

CMA Orientation:

Installation Flexibility: The CMA for the XE9680 can be installed to open on either the left or right side of the server. This flexibility allows for better management of space within the rack and ensures that the CMA can accommodate the specific layout of your data center (Dell) (Dell).

Cable Routing:

Avoid Routing Optical Cables Through the CMA: Optical cables are typically more sensitive and less flexible compared to other types of cables. Routing them through the CMA can lead to bending, twisting, or other stresses that may damage the cables and affect network performance. Therefore, it is advised not to route optical cables through the CMA (Dell) (Dell).

Installation Process:

Align and Install the CMA: Attach the CMA to the designated mounting points on the server rails. Ensure that it is securely fastened and aligned properly to avoid any issues when extending or retracting the server from the rack.

Organize Cables: Use the provided cable management features to route and secure other cables, ensuring they are not pinched or overly stressed. Avoid including optical cables in the CMA to prevent potential damage.

Post-Installation Checks:

Verify Movement: Ensure that the server can be smoothly extended and retracted with the CMA in place without any cables getting caught or strained.

Secure Connections: Double-check all cable connections to ensure they are secure and functioning correctly.

These steps are crucial for maintaining the integrity and performance of the server and the connected network infrastructure. Proper cable management not only ensures safety but also enhances the reliability and maintainability of the data center setup.


Dell PowerEdge XE9680 Installation and Service Manual (Dell).

Dell XE9680 Rack Rail with Cable Management Arm Information (Dell) (Dell).

Question #4

What must be considered regarding stab-in rails with installing a PowerEdge XE server?

Reveal Solution Hide Solution
Correct Answer: C

Understanding Stab-in Rails:

Stab-in rails are designed to simplify the server installation process. These rails enable a quick and straightforward installation of the server into the rack.

Compatibility and Usage:

Stab-in rails are specifically designed for use in 4-post racks with square holes. This compatibility ensures stability and proper fitting within the rack structure.

Installation Process:

Before initiating the installation, verify that the rack is a 4-post, square hole type.

Position the stab-in rails to align with the square holes on the rack. Typically, stab-in rails have tabs that fit precisely into these square holes.

Mounting the Server:

Once the rails are securely attached to the rack, the server can be mounted. The design of the stab-in rails facilitates a smooth insertion of the server, ensuring it is securely held in place.

Ensuring Proper Fit:

After the server is mounted, check to ensure that it is level and securely attached. This step is crucial to prevent any movement or displacement that could occur due to vibrations or physical disturbances.


Dell EMC PowerEdge XE9680 and XE8640 Installation and Service Manual: This manual provides detailed instructions on the use and installation of stab-in rails, including compatibility with specific rack types.

Dell EMC Technical Specifications Guide: Offers comprehensive specifications and compatibility information for different mounting and installation hardware used with Dell PowerEdge servers.

Question #5

A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cable management arm (CMA).

What are two items to consider when installing a CMA?

Reveal Solution Hide Solution
Correct Answer: A, B

When installing a Cable Management Arm (CMA) on the Dell PowerEdge XE9680 server, there are specific considerations to ensure proper installation and operation:

CMA Orientation:

Installation Flexibility: The CMA for the XE9680 can be installed to open on either the left or right side of the server. This flexibility allows for better management of space within the rack and ensures that the CMA can accommodate the specific layout of your data center (Dell) (Dell).

Cable Routing:

Avoid Routing Optical Cables Through the CMA: Optical cables are typically more sensitive and less flexible compared to other types of cables. Routing them through the CMA can lead to bending, twisting, or other stresses that may damage the cables and affect network performance. Therefore, it is advised not to route optical cables through the CMA (Dell) (Dell).

Installation Process:

Align and Install the CMA: Attach the CMA to the designated mounting points on the server rails. Ensure that it is securely fastened and aligned properly to avoid any issues when extending or retracting the server from the rack.

Organize Cables: Use the provided cable management features to route and secure other cables, ensuring they are not pinched or overly stressed. Avoid including optical cables in the CMA to prevent potential damage.

Post-Installation Checks:

Verify Movement: Ensure that the server can be smoothly extended and retracted with the CMA in place without any cables getting caught or strained.

Secure Connections: Double-check all cable connections to ensure they are secure and functioning correctly.

These steps are crucial for maintaining the integrity and performance of the server and the connected network infrastructure. Proper cable management not only ensures safety but also enhances the reliability and maintainability of the data center setup.


Dell PowerEdge XE9680 Installation and Service Manual (Dell).

Dell XE9680 Rack Rail with Cable Management Arm Information (Dell) (Dell).


Unlock Premium Dell PowerEdge XE9680 and XE8640 Install Exam Questions with Advanced Practice Test Features:
  • Select Question Types you want
  • Set your Desired Pass Percentage
  • Allocate Time (Hours : Minutes)
  • Create Multiple Practice tests with Limited Questions
  • Customer Support
Get Full Access Now

Save Cancel