New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Dell EMC D-XTR-MN-A-24 Exam - Topic 3 Question 16 Discussion

Actual exam question for Dell EMC's D-XTR-MN-A-24 exam
Question #: 16
Topic #: 3
[All D-XTR-MN-A-24 Questions]

Which command is used to initiate a Storage Controller power supply replacement for XtremlO cluster ABC123?

Show Suggested Answer Hide Answer
Suggested Answer: B

To replace a power supply unit (PSU) in a storage controller of an XtremIO cluster, a specific command needs to be executed.

The correct command to initiate this process is replace-storage-controller-psu sc-psu-id=1 cluster-id='ABC123'.

This command specifies the action to replace the PSU (replace-storage-controller-psu), the PSU ID (sc-psu-id=1), and the specific cluster ID (cluster-id='ABC123').

Using this command ensures that the correct PSU in the specified cluster is prepared for replacement.


Contribute your Thoughts:

0/2000 characters
Ozell
3 months ago
Are we sure about this? Sounds off.
upvoted 0 times
...
Kanisha
3 months ago
I agree with C, seems right.
upvoted 0 times
...
Claudia
3 months ago
Wait, is it really that simple?
upvoted 0 times
...
Celestine
4 months ago
I think it's B, not C.
upvoted 0 times
...
Vashti
4 months ago
It's definitely option C!
upvoted 0 times
...
Gertude
4 months ago
I think option C looks familiar, but I can't recall if it needs the "psu" or not. I hope I remember the right syntax!
upvoted 0 times
...
Audry
4 months ago
I’m a bit confused about the sc-psu-id part. Did we cover if that’s necessary for the command to work?
upvoted 0 times
...
Antonio
4 months ago
I remember practicing a similar question, and I feel like "replace-storage-controller-psu" was the right format for replacing a power supply.
upvoted 0 times
...
Carlene
5 months ago
I think the command should start with "replace-storage-controller", but I'm not sure if it needs "prepare" or "psu" in it.
upvoted 0 times
...
Cammy
5 months ago
I'm feeling a bit lost on this one. The terminology and specific commands are not something I'm familiar with. I'll try to eliminate the options that don't seem relevant, but I'm not confident I'll get this one right.
upvoted 0 times
...
Leslee
5 months ago
Okay, let me think this through. The question is asking for the command to initiate the power supply replacement, so I'm guessing the "replace-storage-controller-psu" part is the key. Option C seems the most straightforward, but I'll double-check the other options just to be sure.
upvoted 0 times
...
Georgeanna
5 months ago
Hmm, I'm not entirely sure about this one. The commands all look similar, and I'm not familiar with the specific XtremlO cluster commands. I'll need to review the documentation carefully to make sure I choose the right one.
upvoted 0 times
...
Corrie
5 months ago
I think the answer is B. The question specifically asks for the command to initiate a Storage Controller power supply replacement, and the command in option B includes the "replace-storage-controller-psu" keyword along with the cluster ID.
upvoted 0 times
...
Kattie
1 year ago
Wait, does this mean I have to manually replace the power supply? I was hoping for a remote control option. Where's the easy button?
upvoted 0 times
...
Tanja
1 year ago
Hmm, I'd go with option C. It's the most straightforward command and doesn't require any additional parameters.
upvoted 0 times
Sheridan
1 year ago
User 2: Yeah, it seems like the simplest choice.
upvoted 0 times
...
Refugia
1 year ago
User 1: I think option C is the way to go.
upvoted 0 times
...
...
Geraldo
1 year ago
I hear you, buddy. Replacing hardware components is never fun, especially when you're dealing with a cluster. Maybe they'll come up with a 'one-click power supply replacement' feature in the next version.
upvoted 0 times
Kirk
1 year ago
D) replace-storage-controller-prepare sc-psu-id=1 cluster-id=ABC123
upvoted 0 times
...
Ivory
1 year ago
C) replace-storage-controller-psu cluster-id=ABC123
upvoted 0 times
...
Laticia
1 year ago
B) replace-storage-controller-psu sc-psu-id=1 cluster-id=ABC123
upvoted 0 times
...
Stanford
1 year ago
A) replace-storage-controller-prepare cluster-id=ABC123
upvoted 0 times
...
...
Jacki
1 year ago
I'm not sure, but I think C) replace-storage-controller-psu cluster-id=ABC123 could also be a valid option as it directly mentions replacing the power supply for the Storage Controller.
upvoted 0 times
...
Hyun
1 year ago
I disagree, I believe the correct command is D) replace-storage-controller-prepare sc-psu-id=1 cluster-id=ABC123 because it specifically mentions preparing for power supply replacement.
upvoted 0 times
...
Lilli
1 year ago
I think the answer is B) replace-storage-controller-psu sc-psu-id=1 cluster-id=ABC123.
upvoted 0 times
...
Dierdre
1 year ago
Option B looks like the correct one, it specifies the SC-PSU-ID which is required for the replacement process.
upvoted 0 times
Tawanna
1 year ago
No problem, happy to help!
upvoted 0 times
...
Brianne
1 year ago
That makes sense, thanks for pointing that out.
upvoted 0 times
...
Cruz
1 year ago
Yes, option B specifies the SC-PSU-ID which is needed for the replacement process.
upvoted 0 times
...
Dorthy
1 year ago
I think option B is the correct one.
upvoted 0 times
...
...

Save Cancel