Before connecting, mounting and powering 213 total controller-based APs what action should be taken to ensure that they are configured by the controller once powered on and connected lo the network''
A) Configure profiles in the controller and assign them to the APs
B) Configure the controller to provide PoE to the APs
C) Configure the network to allow the APs to have direct Internet access immediately
D) Ensure mat TLS tunnels will work between the APs and the controller

CWNP CWDP-305 Exam - Topic 1 Question 25 Discussion

Actual exam question for CWNP's CWDP-305 exam
Question #: 25
Topic #: 1
[All CWDP-305 Questions]

Before connecting, mounting and powering 213 total controller-based APs what action should be taken to ensure that they are configured by the controller once powered on and connected lo the network''

Show Suggested Answer Hide Answer
Suggested Answer: A

Contribute your Thoughts:

0/2000 characters
Hollis
8 hours ago
I think we need to configure profiles in the controller first, right? That seems like the logical step before powering them on.
upvoted 0 times
...