CompTIA SK0-005 Exam - Topic 1 Question 35 Discussion
Alter rack mounting a server, a technician must install four network cables and two power cables for the server. Which of the following is the MOST appropriate way to complete this task?
A) Wire the four network cables and the two power cables through the cable management arm using appropriate-length cables.
B) Run the tour network cables up the left side of the rack to the top of the rack switch. Run the two power cables down the right side of the rack toward the UPS.
C) Use the longest cables possible to allow for adjustment of the server rail within the rack.
D) Install an Ethernet patch panel and a PDU to accommodate the network and power cables.