Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Cisco 300-615 Exam - Topic 7 Question 9 Discussion

Refer to the exhibit.During implementation of a Cisco UCS C-Series Server, an engineer receives the status that is shown in the exhibit. Which action resolves the issue.
A) Reconfigure the Drive Type from 'Removable' to 'Non-Removable'
B) Insert an SD card into SLOT-2
C) Configure the RAID that is associated with the card.
D) Set SLOT-1 Sync Mode to 'Auto'

Cisco 300-615 Exam - Topic 7 Question 9 Discussion

Actual exam question for Cisco's 300-615 exam
Question #: 9
Topic #: 7
[All 300-615 Questions]

Refer to the exhibit.

During implementation of a Cisco UCS C-Series Server, an engineer receives the status that is shown in the exhibit. Which action resolves the issue.

Show Suggested Answer Hide Answer
Suggested Answer: A

Contribute your Thoughts:

0/2000 characters
Royal
10 months ago
Wait, are we sure it's not a hardware problem? Sounds fishy!
upvoted 0 times
...
Justine
10 months ago
I disagree, D doesn't seem relevant to the issue at hand.
upvoted 0 times
...
Deangelo
11 months ago
C is definitely necessary for RAID setup, can't skip that!
upvoted 0 times
...
Franchesca
11 months ago
I think B is the way to go, SD cards are essential here.
upvoted 0 times
...
Leonardo
11 months ago
Option A seems right, removable drives can cause issues.
upvoted 0 times
...
Julio
11 months ago
Hmm, this one's tricky. I'll need to think carefully about the different runlevels and which ones should never be used as the default.
upvoted 0 times
...
Pamella
11 months ago
Hmm, this is a tricky one. I'll need to carefully review the key differences between the 1100 and 900 ISR routers to determine the best benefit for mid-size organizations.
upvoted 0 times
...
Azzie
11 months ago
Hmm, this looks like a tricky one. I'll need to carefully analyze the information provided in the exhibit and question to determine the correct number of iSCSI sessions.
upvoted 0 times
...
Gerri
11 months ago
This is a tricky one. I can see arguments for operational, program, and project level risks. I'll need to really think through the implications of a poorly managed transition to determine where the risks are most likely to surface.
upvoted 0 times
...
Gabriele
11 months ago
Hmm, I'm a bit unsure about this one. I'll need to carefully read through the details to make sure I understand the requirements before selecting an answer.
upvoted 0 times
...
Miriam
11 months ago
Ugh, I'm not sure about this one. Out-of-band management - what does that even mean? I'll have to guess on this.
upvoted 0 times
...

Save Cancel