Cisco 300-410 Exam - Topic 15 Question 43 Discussion
Refer to the exhibit.An engineer must establish a point-to-point GRE VPN between R1 and the remote site. Which configuration accomplishes the task for the remote site?
C) Interface Tunnel1
tunnel source 200.1.1.3
tunnel destination 199.1.1.1
ip address 192.168.1.3.255.255.255.0
A) Interface Tunnel1
tunnel source 199.1.1.1
tunnel destination 200.1.1.3
ip address 192.168.1.3 255.255.255.0
B) Interface Tunnel1
tunnel source 200.1.1.3
tunnel destination 199.1.1.1
ip address 192.168.1.1.255.255.255.0
D) Interface Tunnel
lunnel source 199.1.1.1
tunnel destination 200.1.1.3
ip address 192.168.1.1.255.255.255.0
Lynsey
10 months agoEmmett
10 months agoRobt
11 months agoJade
11 months agoHaydee
11 months agoLaurene
11 months agoNoel
11 months agoJarvis
11 months ago