In an MRP system, which inputs need to be programmed into the system in order to generate a purchase order for new stock? Select THREE
Comprehensive and Detailed Explanation From Exact Extract:
Core inputs to MRP include the Master Production Schedule (MPS), master/engineered production levels and the Bill of Materials (BOM). Items like the production plan and materials movement plan are outputs/derived plans produced by running the MRP logic. (CIPS L5M10 Study Guide, p. 171)