A firm-wide Revit template has an advanced setup of views preset on sheets. A renovation project has a linked as-built model with levels that do not align with levels from the model template.What method should a BIM manager use to update the levels and create grids in sync with the resource model, without requiring extensive reworking of the preset sheets?
A) Align model levels to the linked levels and use Copy/Monitor to duplicate the linked grids.
B) Create a Scope Box around the linked model and assign it to the template levels and grids.
C) Delete the template's levels and use Copy/Monitor to duplicate the linked levels and grids.
D) Customize a View Template to hide the template levels and only show the linked levels.

AutoDesk BIM_MGT_101 Exam - Topic 3 Question 1 Discussion

Actual exam question for AutoDesk's BIM_MGT_101 exam
Question #: 1
Topic #: 3
[All BIM_MGT_101 Questions]

A firm-wide Revit template has an advanced setup of views preset on sheets. A renovation project has a linked as-built model with levels that do not align with levels from the model template.

What method should a BIM manager use to update the levels and create grids in sync with the resource model, without requiring extensive reworking of the preset sheets?

Show Suggested Answer Hide Answer
Suggested Answer: A

The existing project levels should be retained because the preset floor plans, reflected ceiling plans, and other level-associated views already placed on sheets depend on them. The BIM manager should align those levels with the authoritative as-built levels and then establish monitoring where appropriate. The linked grids can be created in the host through Copy/Monitor, providing native project grids that correspond to the resource model.

Deleting the template levels would also delete or disrupt dependent views, resulting in precisely the extensive sheet and view reconstruction the question requires the BIM manager to avoid. A Scope Box controls datum extents and view cropping; it does not reconcile level elevations or create coordinated grid elements. Hiding the host levels and displaying only linked datums would leave the host project without properly coordinated native reference elements and would not support reliable modelling or documentation.

After alignment and copying, the team should review Copy/Monitor warnings whenever the linked as-built model changes. This preserves the firm's established documentation infrastructure while integrating authoritative project-specific datum information.

Reference topics: Copy/Monitor; level-associated views; linked as-built models; grid coordination; Revit template reuse; datum management.


Contribute your Thoughts:

0/2000 characters
Graciela
1 day ago
Not sure about deleting levels, that sounds risky.
upvoted 0 times
...
Pamella
6 days ago
Copy/Monitor is definitely the way to go!
upvoted 0 times
...
Maryrose
11 days ago
Surprised that no one mentioned option B!
upvoted 0 times
...
Ngoc
17 days ago
I disagree, option C seems more straightforward.
upvoted 0 times
...
Jules
22 days ago
I think option A is the best choice here.
upvoted 0 times
...
Pete
27 days ago
I recall we discussed hiding levels with View Templates, but I wonder if that really solves the problem of syncing with the linked model.
upvoted 0 times
...
Melvin
1 month ago
I feel like deleting the template levels might cause more issues later on, especially with the preset sheets.
upvoted 0 times
...
Amber
1 month ago
I think using a Scope Box could be a good way to manage the levels without messing up the sheets, but I’m not entirely confident.
upvoted 0 times
...
Shaunna
1 month ago
I remember we practiced a similar question about aligning levels, but I’m not sure if Copy/Monitor is the best choice here.
upvoted 0 times
...