Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

ASQ CSSBB Exam - Topic 1 Question 39 Discussion

Posted by Mozell on May 03, 2022 at 04:26 AM

An x-bar control chart has been established with control limits of 3.245 and 3.257, n = 5. An engineer collects the following sample and plots the average on the control chart: 3.257, 3,256, 3. 258, 3.259

Suggested Answer: C

Get Premium CSSBB Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
8 comments · newest first
LI
Lilli 11 months ago
Yup, looks like the engineer needs to check that chart again!
KR
Krystal 12 months ago
n = 5 means the averages should be closely monitored.
TA
Talia 12 months ago
Wait, are we sure the control limits are right?
FI
Fidelia 12 months ago
Totally agree, that's definitely out of control!
RO
Ronny 1 year ago
The average is 3.259, which is above the upper control limit.
MO
Mohammad 1 year ago
Hmm, I'm a bit confused here. The question mentions OAuth, but it's not clear to me how that relates to the different options. I'll need to think this through carefully.
MA
Margery 1 year ago
Hmm, I'm not totally sure about this one. I know default values are used to display some kind of information, but I'm not confident which specific purpose is correct. I'll have to think this through carefully.
AL
Alonso 1 year ago
Hmm, those numbers look tricky. I'll make sure to square the differences from the mean carefully.
0/2000 characters

Save Cancel