Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

ASQ CQE Exam - Topic 1 Question 33 Discussion

An X-bar and R chart was prepared for an operation using twenty samples with five pieces in each sample; X-bar was found to be 33.6 and R-bar was 6.20. During production, a sample of five was taken and the pieces measured 36, 43, 37, 25, and 38. At the time, this sample was taken:
D) Only the range was outside control limits.
A) Both the average and range were within control limits.
B) Neither the average nor range were within control limits.
C) Only the average was outside control limits.

ASQ CQE Exam - Topic 1 Question 33 Discussion

Actual exam question for ASQ's CQE exam
Question #: 33
Topic #: 1
[All CQE Questions]

An X-bar and R chart was prepared for an operation using twenty samples with five pieces in each sample; X-bar was found to be 33.6 and R-bar was 6.20. During production, a sample of five was taken and the pieces measured 36, 43, 37, 25, and 38. At the time, this sample was taken:

Show Suggested Answer Hide Answer
Suggested Answer: D

Contribute your Thoughts:

0/2000 characters
Felix
8 months ago
Yeah, I agree, something's not right here!
upvoted 0 times
...
Lenita
9 months ago
Wait, how did they get those numbers?
upvoted 0 times
...
Sue
9 months ago
Definitely seems like the range is out of control.
upvoted 0 times
...
Merissa
9 months ago
I think the average is way off!
upvoted 0 times
...
Tawny
9 months ago
X-bar is 33.6 and R-bar is 6.20.
upvoted 0 times
...
Rory
9 months ago
This looks like a straightforward question about workstation security standards. I'll focus on the key details in the question stem and think through the answer choices carefully.
upvoted 0 times
...
Dante
9 months ago
I've seen questions like this before, so I think I have a good handle on it. The key is understanding how the grantor, trustee, and beneficiaries' relationships affect the income, gift, and estate tax implications. I'm pretty confident I can work through this and select the right answer.
upvoted 0 times
...
Renea
9 months ago
I'm confident that mean time between success and change lead time are the correct answers here. Those metrics align with the goals of DevOps.
upvoted 0 times
...
Annice
9 months ago
I remember something about how WANs connect multiple locations over larger distances, so I think the answer might be B.
upvoted 0 times
...

Save Cancel