Which of the following will always describe the critical path? The path with

Show Suggested Answer Hide Answer
Suggested Answer: B

Contribute your Thoughts:

Kirk
1 days ago
Hmm, I'm torn between B and C. The critical path has to have zero or negative float, right? I'll go with C just to be different.
upvoted 0 times
...
Hyman
6 days ago
I think the answer is B. The critical path has zero float, meaning no slack time. It's the longest duration, but that's not the only defining feature.
upvoted 0 times
...
Valentine
8 days ago
I think the critical path is the one with the longest duration.
upvoted 0 times
...