A company has just acquired a competitor with a vSphere environment and would like to have the new vSphere environment also monitored by the company's original three-node vRealize Operations cluster. The vRealize Operations Sizing tool determines two additional data node, and a remote collector needs to be added to the vRealize Operations cluster.
The nodes are deployed accordingly, and the administrator now needs to create a trust relationship between the cluster and each of these new nodes.
Which two methods will meet this goal? (Choose two.)
An administrator is planning the size of a new vRealize Operations Manager (vROps) platform using the vROps sizing tool. The output of different configurations and sizing information from the tool were modeled for internal design discussion.
Refer to the exhibit:
Which configuration was sized?
An administrator has enabled the allocation model in a policy and set the CPU overcommit ratio to 4:1 for all vSphere clusters in a vSphere datacenter.
Why would vRealize Operations report that the cluster has 0 days remaining when the actual CPU overcommit ratio is less than the 4:1 configured value?
An administrator is planning the size of a new vRealize Operations Manager (vROps) platform using the vROps sizing tool. The output of different configurations and sizing information from the tool were modeled for internal design discussion.
Refer to the exhibit:
Which configuration was sized?
An administrator has enabled the allocation model in a policy and set the CPU overcommit ratio to 4:1 for all vSphere clusters in a vSphere datacenter.
Why would vRealize Operations report that the cluster has 0 days remaining when the actual CPU overcommit ratio is less than the 4:1 configured value?
Submit Cancel