Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

VMware 3V0-32.23 Exam - Topic 3 Question 12 Discussion

An architect is designing an Aria Automation for Secure Host for configuration management and Security operations with the following requirements:The network has more than 500 nodes to be managed.The number of nodes can scale up to 5000 as the network grows.There is a need for load balancing.What two aspects does the architect need to include when designing the solution? (Choose two.)
A) Deploy Aria Automation for Secure Host with Aria Suite Lifecycle Manager and C) Prepare four nodes with different functions such as RaaS, the Salt master, PostgreSQL and Redis
B) Deploy Aria Automation for Secure Host with standard installation
D) Prepare two nodes with the RaaS function
E) Prepare three nodes with a Databases function

VMware 3V0-32.23 Exam - Topic 3 Question 12 Discussion

Actual exam question for VMware's 3V0-32.23 exam
Question #: 12
Topic #: 3
[All 3V0-32.23 Questions]

An architect is designing an Aria Automation for Secure Host for configuration management and Security operations with the following requirements:

The network has more than 500 nodes to be managed.

The number of nodes can scale up to 5000 as the network grows.

There is a need for load balancing.

What two aspects does the architect need to include when designing the solution? (Choose two.)

Show Suggested Answer Hide Answer
Suggested Answer: A, C

For large, scalable, and load-balanced environments, deploy Aria Automation for Secure Host using Suite Lifecycle Manager and architect the solution with dedicated nodes for each core function (RaaS, Salt master, PostgreSQL, Redis) to ensure performance and reliability.


Contribute your Thoughts:

0/2000 characters
Theola
29 days ago
I think B is a solid choice too.
upvoted 0 times
...
Stevie
1 month ago
Gotta go with A and C for sure!
upvoted 0 times
...
Samuel
2 months ago
I remember that we should consider the database functions too, but I’m not sure if three nodes are necessary. Maybe two with RaaS would be enough?
upvoted 0 times
...
Chun
2 months ago
I think we practiced a similar question where load balancing was a key factor. I’m leaning towards option A and C, but I’m not completely confident.
upvoted 0 times
...
Lavonna
2 months ago
I'm a bit unsure about the node preparation options. I feel like having different functions like RaaS and the Salt master is important, but I can't recall if we need four nodes or if two would suffice.
upvoted 0 times
...
Merissa
2 months ago
I remember we discussed the importance of scalability in our last practice session. I think deploying with Aria Suite Lifecycle Manager might be crucial for managing those 5000 nodes.
upvoted 0 times
...

Save Cancel