US Green Building Council Exam LEED-AP-O+M Topic 1 Question 15 Discussion

Actual exam question for US Green Building Council's LEED-AP-O+M exam
Question #: 15
Topic #: 1
[All LEED-AP-O+M Questions]

Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the

Show Suggested Answer Hide Answer
Suggested Answer: C

The Owner Project Requirements (OPR) is a document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project. It typically includes key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels. The OPR is used as a guiding document throughout the design and construction process to ensure that the team is aligned with the owner's vision and goals.


The Owner Project Requirements (OPR) is a critical document that outlines the functional and operational objectives of a project, reflecting the owner's needs and expectations. This document serves as a foundation for the design team to develop the Basis of Design (BOD) and guides the project through its lifecycle, ensuring that the owner's operational needs, such as occupied hours, use by space type, required temperature settings, and lighting levels, are met. The OPR typically includes information on building occupancy schedules, space usage types, environmental conditions like temperature and lighting requirements, and other owner-driven criteria essential for the building's design and operation. By clearly defining these parameters upfront, the OPR ensures that the project team has a clear understanding of what is expected from the building's performance, facilitating a design that aligns with the owner's vision and operational needs.

Contribute your Thoughts:

Lashanda
30 days ago
Honestly, this question is a piece of cake. The Owner Project Requirements is the clear winner. Gotta love when they make it this easy.
upvoted 0 times
...
Raylene
1 months ago
The Current Facility Requirements? Really? That's for existing buildings, not new designs. Come on, people, let's focus here!
upvoted 0 times
...
Alyssa
2 months ago
I'm not sure, but I think it could also be C) Owner Project Requirements, as they specify the project goals and requirements.
upvoted 0 times
...
Erasmo
2 months ago
I agree with Katy, because the Basis of Design outlines the key parameters for the building.
upvoted 0 times
...
Eladia
2 months ago
Hmm, this is a tough one. I'm torn between the Basis of Design and the Owner Project Requirements. Guess I'll have to go with my gut and say Option A.
upvoted 0 times
...
Chandra
2 months ago
I'm going with the Design Narrative on this one. That's where the design team lays out all the details, including the building's operational requirements.
upvoted 0 times
Glory
1 months ago
Actually, it's the Basis of Design that specifies those key parameters.
upvoted 0 times
...
Dusti
1 months ago
I think the Owner Project Requirements is where you'll find those details.
upvoted 0 times
...
...
Delisa
2 months ago
The Owner Project Requirements is definitely the right answer here. That's where all the key functional and operational parameters are specified.
upvoted 0 times
Shaquana
14 days ago
D) Current Facility Requirements
upvoted 0 times
...
Ling
18 days ago
C) Owner Project Requirements
upvoted 0 times
...
Irving
1 months ago
B) Design Narrative
upvoted 0 times
...
Ira
1 months ago
A) Basis of Design
upvoted 0 times
...
...
Katy
2 months ago
I think the answer is A) Basis of Design.
upvoted 0 times
...