Posted by Carey on Sep 26, 2026 at 11:34 AM

The design charrette must occur no later than which phase in order to earn the Integrative Process Credit, Option 2: Design Charrette?

Suggested Answer: B

The LEED for Homes Rating System (v4) includes the Integrative Process (IP) Credit: Integrative Process, Option 2: Design Charrette, which requires a collaborative meeting early in the design process to integrate green strategies.

According to the LEED Reference Guide for Homes Design and Construction (v4):

IP Credit: Integrative Process, Option 2: Design Charrette (1 point)

Conduct a design charrette no later than the schematic design phase to ensure early integration of green strategies across all project aspects, including energy, water, and materials.

Source: LEED Reference Guide for Homes Design and Construction, v4, Integrative Process Credit: Integrative Process, p. 45.

The LEED v4.1 Residential BD+C rating system confirms:

IP Credit: Integrative Process, Option 2: Design Charrette

The charrette must occur no later than the schematic design phase to effectively influence the project's sustainability goals and design decisions.

Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.

The correct answer is Schematic Design (Option B), as the charrette must occur by this phase to ensure early integration of sustainable strategies.

Why not the other options?

A . Bid Solicitation: This is a post-design phase, too late for the charrette's purpose.


C . Design Development: This is later than schematic design, reducing the charrette's impact on early design decisions.

D . Construction Drawings: This is a final design phase, far too late for integrative planning.

The LEED AP Homes Candidate Handbook emphasizes IP credits, including the timing of the design charrette, and references the LEED Reference Guide for Homes Design and Construction as a key resource. The exam is based on LEED v4, ensuring the relevance of the schematic design phase.

References:

LEED Reference Guide for Homes Design and Construction, v4, USGBC, Integrative Process Credit: Integrative Process, p. 45.

LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.usgbc.org/credits).

LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4).

USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org/resources/leed-homes-design-and-construction-v4).

LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming charrette timing.

Get Premium LEED-AP-Homes Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
5 comments · newest first
YU
Yuki 5 days ago
It has to happen by Schematic Design!
JA
Jamal 10 days ago
I'm confused about this one. I thought it might be during Design Development, but now I'm second-guessing myself.
TA
Tammy 15 days ago
I feel like I saw a similar question where it mentioned the importance of early collaboration, which makes me think it can't be after Design Development.
OD
Odette 20 days ago
I remember something about it needing to be before the construction phase, so I’d lean towards Schematic Design as well.
EM
Emeline 25 days ago
I think the design charrette should happen early in the process, so maybe Schematic Design? But I'm not entirely sure.
0/2000 characters