New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

SolarWinds Hybrid Cloud Observability Network Monitoring Exam - Topic 2 Question 48 Discussion

Actual exam question for SolarWinds's Hybrid Cloud Observability Network Monitoring exam
Question #: 48
Topic #: 2
[All Hybrid Cloud Observability Network Monitoring Questions]

What is the correct sequence of steps to create a device studio poller?

Show Suggested Answer Hide Answer
Suggested Answer: D

Contribute your Thoughts:

0/2000 characters
Stephaine
3 days ago
D is the way to go. Saving the poller last ensures you don't lose any of your work.
upvoted 0 times
...
Tracie
8 days ago
C seems like the right order to me. You gotta select the tech first before you can specify the data source.
upvoted 0 times
...
Felton
13 days ago
I think the correct sequence is B. It just makes the most logical sense to me.
upvoted 0 times
...
Brandon
18 days ago
I practiced a question like this, and I think assigning the poller to the node should come before saving it, which makes me think option A could be right.
upvoted 0 times
...
Casie
24 days ago
I feel like saving the poller should be one of the last steps, but I can't recall the exact sequence.
upvoted 0 times
...
Gearldine
29 days ago
I remember a similar question where the assignment to the node came after specifying the data source, so I might lean towards option C.
upvoted 0 times
...
Carry
1 month ago
I think the first step should definitely be selecting the technology, but I'm not sure about the order after that.
upvoted 0 times
...
Cornell
1 month ago
I think the answer is B. That seems to be the most logical order of the steps required. I'm feeling good about that choice.
upvoted 0 times
...
Domitila
1 month ago
I'm a bit confused on the order of the steps here. I'll need to review the material again to make sure I understand the proper sequence for creating a device studio poller.
upvoted 0 times
...
Jacinta
2 months ago
Okay, let me walk through this step-by-step. I'm pretty confident the answer is B. You need to select the technology first, then assign the poller, specify the data source, and save it.
upvoted 0 times
...
Tatum
2 months ago
Hmm, I'm not entirely sure about this one. I'll have to think it through carefully. Maybe C or D could also be correct, but I'll need to double-check the steps.
upvoted 0 times
...
Xuan
2 months ago
I think the correct sequence is B. It makes the most sense to select the technology first, then assign the poller to a node, specify the data source, and finally save the poller.
upvoted 0 times
...

Save Cancel