Haha, variable sprint duration? Sounds like a recipe for chaos! I'd stick with B and D - adjust based on the team, and keep each sprint at a fixed length.
Hmm, I think C and D are the way to go. Variable sprint duration based on the work needed, and a fixed duration for each sprint. Keeps things flexible but structured.
Definitely B and D. Sprint duration should be adjusted based on team availability, and each sprint should have a fixed duration to maintain consistency.
Alberta
14 hours agoDewitt
4 days agoLaurel
6 days agoQueenie
10 days agoMelita
29 days agoRusty
16 hours agoDomonique
2 days agoElvera
29 days agoPearline
1 months ago