I'm not sure about this one. I was hoping it would be as easy as A) Result Analysis (RA) Version and B) Result Analysis (RA) key, but those don't sound quite right. Guess I'll have to do some more studying on the product cost collector.
Hmm, I think the correct answers are C) Costing variant for preliminary costing and D) Variance variant. The product cost collector is used to configure the costing process, so those two options seem like the right default values to configure.